Payment Terms | L/C, T/T |
Delivery Time | 60 days |
Packaging Details | Wooden box |
Application | chemical processing |
Type | Natural gas dehydration |
Afer-sales service | Engineers available to service machinery overseas |
Voltage | 380 V,415V, 50HZ,60HZ |
Name | TEG gas dehydration unit |
Condition | New |
Warranty | 1 year |
Factory | more than 20 years experience |
Brand Name | SCRT |
Model Number | HZ-T220 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
TEG Natural Gas Dehydration High Performance Direct Fire Tube Heating Method
Chemical Processing Natural Gas Dehydration Triethylene Glycol Gas Dehydration
Molecular Seive Natural Gas Dehydration For Natural Gas Processing
Molecular Seive Gas Dehydration Unit High Operation Flexibility Continuous
Product Specification
Payment Terms | L/C, T/T | Delivery Time | 60 days |
Packaging Details | Wooden box | Application | chemical processing |
Type | Natural gas dehydration | Afer-sales service | Engineers available to service machinery overseas |
Voltage | 380 V,415V, 50HZ,60HZ | Name | TEG gas dehydration unit |
Condition | New | Warranty | 1 year |
Factory | more than 20 years experience | Brand Name | SCRT |
Model Number | HZ-T220 | Certification | ISO |
Place of Origin | China | ||
High Light | gas dehydration unit ,dehydration units for natural gas |
TEG Dehydration unit manufacturer with low cost and reliable preformance
Description:
Gas dehydration is a fundamental step in gas treatment and is included in nearly all gas processing units in order to prevent the formation of hydrates in high pressure natural gases during gas transmission or during cryogenic gas processing ,such as LPG / NGL recovery or in LNGs. Dehydration is also applied to prevent corrosion from condensed water in sour gas streams.
Features:
The natural gas glycol dehydration unit has the below features.
The treat capacity of TEG dehydration equipment for natural gas is 150X104. The operating flexibility is 50-100%. The production time will be 8000 hours per year.
The equipment uses 99.74 (wt) TEG as dehydrate to get rid of the water in natural gas.
GET process is simple and mature. It has good stability and can get low dew point.
It's easy to regenerate and operate. The cost will lower than other method.
Technical parameter:
Inlet gas condition | ||
1 | Flow | 290.1X104 Nm3/d |
2 | Inlet Pressure | 4.86-6.15 MPa |
3 | Inlet Temperature | -48.98℃ |
Outlet gas condition | ||
4 | Flow | 284.4X104 Nm3/d |
5 | Outlet pressure | 4.7-5.99 MPa |
6 | Outlet temperature | -50.29℃ |
7 | H2S | ≤20g/m3 |
8 | CO2 | ≤3% |
9 | Water dew point | <-5℃ |
Company Details
Business Type:
Manufacturer
Year Established:
1995
Total Annual:
>110 millions
Employee Number:
700~800
Ecer Certification:
Active Member
Sichuan Rongteng Automation Equipment Co., Ltd. Is the wholly-owned subsidiary of Sichuan Jinxing Clean Energy Equipment Holding Co., Ltd. We have been in oil and natural gas industry since 1995. We provide solutions and equipment package for the below. Crude oil treatment ... Sichuan Rongteng Automation Equipment Co., Ltd. Is the wholly-owned subsidiary of Sichuan Jinxing Clean Energy Equipment Holding Co., Ltd. We have been in oil and natural gas industry since 1995. We provide solutions and equipment package for the below. Crude oil treatment ...
Get in touch with us
Leave a Message, we will call you back quickly!