Payment Terms | T/T, Western Union, MoneyGram |
Supply Ability | 100000 Sets Per Month |
Delivery Time | 25~40 Days |
Packaging Details | Box |
Product name | Clothing carbon fiber heating pad |
Work voltage | 7.4V or 11.1V |
Pad quantity | 3-pad, can be customized |
DC connector | DC3.5*1.35mm, can be customized |
Brand Name | RAGIOE |
Model Number | No |
Certification | FCC |
Place of Origin | China |
View Detail Information
Explore similar products
7.4V Portable Charger For Heated Vest Battery Pack For Heated Coat
2A 5 Volt Battery Pack For Heated Vest 10050mAh 36.18Wh
10050mAh Heated Vest Battery Pack Heated Body Warmer Battery Pack
CE FCC Heated Jacket Power Pack 5V USB Power Pack For Heated Jacket
Product Specification
Payment Terms | T/T, Western Union, MoneyGram | Supply Ability | 100000 Sets Per Month |
Delivery Time | 25~40 Days | Packaging Details | Box |
Product name | Clothing carbon fiber heating pad | Work voltage | 7.4V or 11.1V |
Pad quantity | 3-pad, can be customized | DC connector | DC3.5*1.35mm, can be customized |
Brand Name | RAGIOE | Model Number | No |
Certification | FCC | Place of Origin | China |
High Light | FCC Jacket Heating Pads ,7.4V Far Infrared Heating Pad ,11.1 Volt Far Infrared Heating Pad |
Battery Powered Far Infrared Heating Pad 7.4V/11.1 Volt Thermal Electric Carbon Fiber Heating Element For Clothes
Main features:
Specifications:
Product name | Clothing carbon fiber heating pad | ||
Work voltage | 7.4V or 11.1V | ||
Pad quantity | 3-pad, can be customized | ||
DC connector | DC3.5*1.35mm, can be customized | ||
Certificates | CE FCC | ||
M.O.Q. | 1000 PCS | ||
OEM/ODM M.O.Q. | 1000 PCS | ||
Lead time for sample | 7~14 days | ||
Lead time for bulk order | 25~40 days (depends on quantity) | ||
Payment terms | 40% deposit, all balance before delivery, T/T | ||
Warranty | One year |
Application:
Heated clothing, heated jacket, heated vest, heated gear, heated garment, etc.
Detail picture
FAQ
Q1: What is your MOQ?
A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.
Q2: Can I get sample?
A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.
Q3: How long is the sample lead time?
A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.
Q4: How long is the mass production lead time?
A: It takes 30~60 days (depends on quantity).
Q5: Can you provide OEM service?
A: Yes, generally OEM MOQ is 1000pcs.
Q6: What format of the file do you need if I want my own design?
A: Files best in AI, CDR, or PDF format.
Q7: What are your shipping methods and freight charge?
A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.
Q8: What are your payment terms?
A: We accept payment by T/T, generally 50% deposit + 50% balance.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2018
Ecer Certification:
Verified Supplier
Dongguan Lixiang Energy Technology Co., Ltd, which was founded in 2018, with parent company Shenzhen Lixiang Energy Co., Ltd founded in 2011, is a professional manufacturer engaged in research and development, production and sales of intelligent heated clothing, air conditioned clothing and related ... Dongguan Lixiang Energy Technology Co., Ltd, which was founded in 2018, with parent company Shenzhen Lixiang Energy Co., Ltd founded in 2011, is a professional manufacturer engaged in research and development, production and sales of intelligent heated clothing, air conditioned clothing and related ...
Get in touch with us
Leave a Message, we will call you back quickly!