Payment Terms | T/T, Western Union, MoneyGram |
Supply Ability | 100000 Sets Per Month |
Delivery Time | 25~40 Days |
Packaging Details | Box |
Power supply | Power bank |
Speed controller | 3-speed levels |
Fan motor | Brushless |
Fan blades | 7 |
One set include | 2pcs fans+1pc speed controller |
Warranty | One year |
Brand Name | RAGIOE |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
7.4V Air Conditioned Vest Cooling Fan Battery 2000 Hours Life
10050mAh Air Conditioned Clothes Fan 5V Cooling Vest Battery
12V Jacket Cooling Fan 6700mAh Air Conditioning Suit Fan
Product Specification
Payment Terms | T/T, Western Union, MoneyGram | Supply Ability | 100000 Sets Per Month |
Delivery Time | 25~40 Days | Packaging Details | Box |
Power supply | Power bank | Speed controller | 3-speed levels |
Fan motor | Brushless | Fan blades | 7 |
One set include | 2pcs fans+1pc speed controller | Warranty | One year |
Brand Name | RAGIOE | Certification | CE |
Place of Origin | China | ||
High Light | Air Conditioning Jacket Cooling Fan ,Brushless Jacket Cooling Fan ,5V USB Jacket Cooling Fan |
Fan Set For Air-Conditioning Work Clothes Work Clothes Fan Air-Conditioning Fan Separately 3-Stage Wind Power
Main features:
Description:
Specifications:
Product name | 5V Cooling fans set | ||
Fan specification | Shell materil: plastic | ||
Motor: brushless | |||
Blades: 7 blades | |||
Outer diameter: around 106mm | |||
Inner diameter: around 90mm | |||
Thickness: 46.5mm | |||
Connector: DC3.5*1.35 | |||
Color: black, can be customized | |||
Weight: around 95g | |||
Working life: more than 2000 hours | |||
Speed controller specification | Two connectors for fans: DC3.5*.35 | ||
One connect for power bank: USB-A | |||
Speed levels: 3 levels | |||
Power supply | Any power bank in market which supply 5V2A minimum output | ||
M.O.Q. | 1000 PCS | ||
OEM/ODM M.O.Q. | 1000 PCS | ||
Lead time for sample | 7~14 days | ||
Lead time for bulk order | 25~40 days (depends on quantity) | ||
Payment terms | 40% deposit, all balance before delivery, T/T | ||
Warranty | One year |
Detail picture
FAQ
Q1: What is your MOQ?
A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.
Q2: Can I get sample?
A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.
Q3: How long is the sample lead time?
A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.
Q4: How long is the mass production lead time?
A: It takes 30~60 days (depends on quantity).
Q5: Can you provide OEM service?
A: Yes, generally OEM MOQ is 1000pcs.
Q6: What format of the file do you need if I want my own design?
A: Files best in AI, CDR, or PDF format.
Q7: What are your shipping methods and freight charge?
A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.
Q8: What are your payment terms?
A: We accept payment by T/T, generally 50% deposit + 50% balance.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2018
Ecer Certification:
Verified Supplier
Dongguan Lixiang Energy Technology Co., Ltd, which was founded in 2018, with parent company Shenzhen Lixiang Energy Co., Ltd founded in 2011, is a professional manufacturer engaged in research and development, production and sales of intelligent heated clothing, air conditioned clothing and related ... Dongguan Lixiang Energy Technology Co., Ltd, which was founded in 2018, with parent company Shenzhen Lixiang Energy Co., Ltd founded in 2011, is a professional manufacturer engaged in research and development, production and sales of intelligent heated clothing, air conditioned clothing and related ...
Get in touch with us
Leave a Message, we will call you back quickly!