Payment Terms | T/T |
Supply Ability | 400 km per year |
Delivery Time | 18 working days |
Packaging Details | Customized as required |
Material | Lining for pipe |
Diameter | DN1500 |
Thickness | 16mm |
Length | 120m |
Weight | Variable |
Life | 50 years |
Brand Name | DAO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Repair UV CIPP Lining Sewer Cure Drain CIPP Liner Material
CIPP Spot Lining Repair Cured In Place Pipe Relining UV Light Curing Machine
UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig
UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban
Product Specification
Payment Terms | T/T | Supply Ability | 400 km per year |
Delivery Time | 18 working days | Packaging Details | Customized as required |
Material | Lining for pipe | Diameter | DN1500 |
Thickness | 16mm | Length | 120m |
Weight | Variable | Life | 50 years |
Brand Name | DAO | Place of Origin | Jiangsu, China |
High Light | UV CIPP Linings Trenchless DAO ,Wet Out UV CIPP Linings DAO ,cipp wet out DAO |
Lining material for pipe renewal and renovation via CIPP trenchless technology
UV lining material characteristics
1. After repair, there is no joint in the pipe, the overall thickness is uniform, the surface is free of damage, large-area folds, and bubbles, and the inner wall surface is smooth, effectively improving the water passing capacity of the pipe.
2. the whole pipe has no interface and can adapt to non-circular sections and curved pipes.
3. Various pipe materials have strict requirements for pipeline repair pretreatment. No sundries and ponding are allowed in the pipeline to be repaired.
4. the construction period is short, and the fastest curing speed can reach 2m/ min.
5. The construction is convenient, and the material can react after being irradiated by light without preheating; The service life shall not be less than 30 years according to the design requirements, and the longest service life can be up to 50 years.
6. The materials are pulled into the pipeline in advance, and the construction steps are simplified. 7. the construction is safe. The whole reaction process of materials is carried out in the pipeline without personnel going down the well. The whole construction process is not limited by seasonal areas.
How to | No digging |
Application | Sewers |
Length | Any length is possible |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...
Get in touch with us
Leave a Message, we will call you back quickly!