Payment Terms | T/T |
Supply Ability | 400 km per year |
Delivery Time | 18 working days |
Packaging Details | Customized as required |
Resin type | Polyester resin |
Diameter | DN900 |
Thickness | 8mm |
Length | 90m |
Weight | Variable |
Life | 50 years |
Brand Name | DAO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban
UV Pipe Lining Coating Sewer Inner Repair Sewer Liner CIPP Process No Dig
Cure UV CIPP Lining Urban Rural Sewer Pipes Repair Cured In Place Pipe Lining
Drain Relining UV CIPP Construction renovation of potable water pressure pipes
Product Specification
Payment Terms | T/T | Supply Ability | 400 km per year |
Delivery Time | 18 working days | Packaging Details | Customized as required |
Resin type | Polyester resin | Diameter | DN900 |
Thickness | 8mm | Length | 90m |
Weight | Variable | Life | 50 years |
Brand Name | DAO | Place of Origin | Jiangsu, China |
High Light | cipp lines DAO ,Fibers Reinforced cipp ,cipp cured in place pipes lining equipment |
UV liner for the trenchless repair of underground and municipal sewers pipelines
Method for preparation of UV CIPP process
Use a CCTV robot to thread a rope to pull the bottom membrane: (use a braided rope, do not replace the rope at will, otherwise, the material or membrane will rotate in the pipe) the connection buckle between the rope head and the bottom membrane should be firmly fastened, and another rope to pull the material should be placed on the upper end of the bottom membrane (if a winch is used, it is a steel wire rope).
Ensure that the material and rope are not mixed with the rotation of the bottom membrane during the membrane pulling process. For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.
Fixing method | Trenchless |
Method | CIPP |
Length | Any length is possible |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...
Get in touch with us
Leave a Message, we will call you back quickly!