China factories

China factory - Daoyunai Energy Saving Technology Limited

Daoyunai Energy Saving Technology Limited

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network

  1. China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
  2. China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
  3. China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
  4. China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network
  5. China Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network

Underground Trenchless Pipeline Construction Machine UV CIPP Sewage Network

  1. MOQ: 80m
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 32 km per month
Delivery Time 15 working days
Packaging Details Normal
Material Liner and UV cure
Diameter DN1400
Thickness 14mm
Length 20m
Environment Environment protection
Life 50 years
Brand Name DAO
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 32 km per month
Delivery Time 15 working days Packaging Details Normal
Material Liner and UV cure Diameter DN1400
Thickness 14mm Length 20m
Environment Environment protection Life 50 years
Brand Name DAO Place of Origin Jiangsu, China
High Light DAO underground trenchless machineryunderground Trenchless Pipeline ConstructionTrenchless Pipeline Construction machine

UV CIPP trenchless construction work for repairing underground sewage network

 

CIPP UV curing

1) Set repair parameters, repair pipe diameter, repair material wall thickness, and number of UV lamp sections on the console;

2) After the parameter setting is completed, turn on the UV light source and start the in-situ curing at the initial well end. The in-situ curing time varies according to the pipe diameter. Please refer to the repair parameter table;

3) After the in-situ curing is completed, the take-up switch starts to take up at a uniform speed. See the repair parameter table for the curing speed;

4) During the curing process, the repair temperature shall be observed in real-time. The appropriate temperature is 80-130 ℃. If the temperature does not reach 80 ℃, the curing take-up speed can be reduced appropriately.

5) During the curing process, observe the traveling mileage of the lamp holder on the display screen and pay attention to the cable marks. When the lamp holder reaches the end point, turn off the cable reel take-up switch in time, and then complete the in-situ curing at the well end. After the curing, turn off the UV light

6) After the light is turned off, adjust the air volume to reduce the internal pressure of the pipe to atmospheric pressure, turn off the fan, and then cool it for 20-40min until the hose is fully cured and cooled.

8. Post-processing

1) When it is cooled to normal temperature, open the binding cover plate at the end of the well and take out the repair lamp holder. At this time, it is necessary to wear gloves to prevent the lamp holder from being hot. At the same time, loosen the high-temperature string on the lamp holder. Do not pull it out. It is necessary to ensure that it is placed in the pipeline;

2) Remove the binding heads at both ends, and ensure that the string in the pipe is not pulled out during the removal of binding heads;

3) Cut off the excess liners at both ends of the start well and the end well. During cutting, pay attention to safety to ensure smooth cutting. During cutting, ensure that the liners exceed the old pipes by 20-30mm. During cutting, pay attention to wearing protective facilities;

4) Pull out the inner membrane with the high-temperature rope in the pipe;

5) Seal the cut liner;

6) Clean up underground operation garbage and arrange underground operation tools.

 

 How  CIPP technology
 Application  Public or private sewers
 Length  Any length is possible

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement