China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair
China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair

  1. China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair
  2. China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair
  3. China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair
  4. China Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair

Cured In Place Pipe CIPP Water Inversion Hot Water Cure Underground Pipes Repair

  1. MOQ: 68m
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 300km per year
Delivery Time 15 workding days
Packaging Details Variable
Material Non-woven felts with resin
Structure 6 layers
Diameter DN1800
Thickness 19mm
Color Original
Length 190m
Brand Name DAO
Model Number DN1800
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 300km per year
Delivery Time 15 workding days Packaging Details Variable
Material Non-woven felts with resin Structure 6 layers
Diameter DN1800 Thickness 19mm
Color Original Length 190m
Brand Name DAO Model Number DN1800
Place of Origin Jiangsu, China
High Light DAO Cured in Place Pipe CIPP Water InversionsCIPP Water Inversion Hot water cureDAO CIPP NO Digs

Hot water cure and inversion material for underground pipes repair NO Digging

 

The hot water cure liner trenchless repair construction process is mainly divided into two parts: Material Factory fabrication and construction site inversion:

 

(1) Material factory fabrication

Factory fabrication of materials mainly includes three steps:

① Cut off the length of the hose according to the engineering design requirements, and calculate the quantity of resin and other materials;

② Fully vacuum the turnover soft cylinder, so that the resin can fully soak the felt layer;

③ Put the resin and curing agent into the mixing barrel according to a certain proportion for full mixing. After mixing them evenly, pour them into the turnover soft barrel, and evenly pour the resin into the soft barrel through the turnover pressing platform to form the turnover repair material;

 

2) Construction site inversion

Before inverting, it is necessary to ensure that the pipeline meets the conditions. Therefore, before inverting, the pipeline shall be blocked, drained, and dredged accordingly. If necessary, the internal part of the pipeline shall be treated (such as local deformation recovery), so as to ensure that the quality of the overturned lining meets the requirements.

Before the materials enter the site, a turnover platform shall be set up at the inversion wellhead.

 

(3) Heating

A hot water boiler is used to heat the flexible liner cylinder circularly. By continuously raising the temperature of the water in the pipeline, the resin will react. After reaching a certain temperature (about 85 ℃) for a certain time, the pipeline repair will be cured and completed.

 

(4) Tail end treatment

After the pipe is cooled, the excess part at the tail end of the pipe shall be cut off to keep it level with the pipe orifice. At the same time, the pipe interface shall be grouted to integrate the new pipe and the old pipe, so as to complete the CIPP lining repair of the pipe.

 

Function  Underground pipe repair
Inversion  Water
Cure  Hot water
Diameters  DN1800mm

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement