Payment Terms | T/T |
Supply Ability | 220 km per year |
Delivery Time | 15 working days |
Packaging Details | Normal |
Material | UV light |
Diameter | DN500 |
Thickness | 6mm |
Length | 360m |
Weight | Variable |
Life | 50 years |
Brand Name | DAO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
Sewer UV Cured CIPP Lining Systems Trenchless Construction Site Management DN300
Cured-In-Place-Pipe UV Cured CIPP Services DN1200 Sewers Renewal Construction
Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public
UV Pipe Lining Trenchless Sewer Repair Services Municipal Pipelines Maintenance
Product Specification
Payment Terms | T/T | Supply Ability | 220 km per year |
Delivery Time | 15 working days | Packaging Details | Normal |
Material | UV light | Diameter | DN500 |
Thickness | 6mm | Length | 360m |
Weight | Variable | Life | 50 years |
Brand Name | DAO | Place of Origin | Jiangsu, China |
High Light | Rehabilitations UV Cured CIPP DAO ,UV Cured CIPP Relinings DAO ,relinings cipp DAO |
UV cure product for urban pipes service and repair by no excavation process
UV CIPP curing trenchless repair:
UV curing uses UV light as the curing medium. The resin contains a photoinitiator. When irradiated by UV light of a specific wavelength, the resin will produce a curing reaction to form a new high-strength lined pipe. The installation method is mainly pull-in type, which is applicable to drainage pipes of various shapes with a pipe diameter of 150mm~1600mm. During construction, the windlass is used to pull the glass fiber inner liner filled with resin into the existing pipeline, and the inner liner is "blown" by a large flow fan, and then clings to the inner wall of the existing pipeline. After solidification, the pipeline can not rely on the original pipeline, and can independently bear internal and external pressure. The repaired new pipe will not affect the water flow section, and the normal service life is more than 50 years.
UV curing repair process:
(fixed binding head) (sent to lamp rack) (UV curing) (repaired pipe)
UV curing repair features and advantages:
◆ little impact on traffic, etc. Trenchless lining repair without excavation of work pit;
◆ good construction controllability and short construction period. The whole curing process is monitored by CCTV, and the pulling in and curing can be completed in only 3 to 4 hours;
◆ energy saving and high security. UV curing is adopted, with low energy demand. No water or steam curing is used at the construction site, and no toxic gas or other harmful substances are produced;
◆ the inner liner has a good sealing effect, strong corrosion-resistance, and long service life;
◆ high mechanical strength can be achieved under small thickness to reduce the current carrying loss of pipe diameter;
◆ high bending elastic modulus, bending, and tensile strength;
◆ many domestic and international authoritative quality certifications.
How | CIPP |
Application | Storm |
Length | Any length is possible |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...
Get in touch with us
Leave a Message, we will call you back quickly!