China factories

China factory - Daoyunai Energy Saving Technology Limited

Daoyunai Energy Saving Technology Limited

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China safety cured in place sewer lining cipp technology Non excavation liner
China safety cured in place sewer lining cipp technology Non excavation liner

  1. China safety cured in place sewer lining cipp technology Non excavation liner
  2. China safety cured in place sewer lining cipp technology Non excavation liner
  3. China safety cured in place sewer lining cipp technology Non excavation liner
  4. China safety cured in place sewer lining cipp technology Non excavation liner
  5. China safety cured in place sewer lining cipp technology Non excavation liner

safety cured in place sewer lining cipp technology Non excavation liner

  1. MOQ: 60m
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 400 km per year
Delivery Time 18 working days
Packaging Details Customized as required
Resin type Polyester resin
Diameter DN900
Thickness 8mm
Length 90m
Weight Variable
Life 50 years
Brand Name DAO
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 400 km per year
Delivery Time 18 working days Packaging Details Customized as required
Resin type Polyester resin Diameter DN900
Thickness 8mm Length 90m
Weight Variable Life 50 years
Brand Name DAO Place of Origin Jiangsu, China
High Light cured-in-place pipe cipp technologys DAOcured-in-place pipe safetycured-in-place sewer pipe lining

The non-excavation liner of high strength and quality for UV trenchless curing sewers

 

Classification:

The first method is preventive repair and salvage repair according to the priority of repair time.

 

Preventive repair: a city needs to reasonably plan and manage the underground pipelines and these fixed assets, including the laying year, main pipe diameters, geographical location, regional development planning (government location, core residential areas, major commercial areas, important industrial areas, etc.), as well as the status of underground surrounding pipelines, operation status, operation and maintenance records, resident complaint rate and other information, plan in advance, and lay out the repair plan and budget in advance, Repair according to priority.

 

Salvage repair: the underground pipe network system transports a large amount of sewage into the treatment plant every day. Ground dynamic loads such as large trucks will cause fatal damage to the underground pipe network. Especially in the thunderstorm season, a large amount of rainwater enters the drainage pipeline, causing an unknown risk of a pipeline rupture. Therefore, salvage repair may be required anytime, anywhere.

 

 Fixing method   Non-excavation 
 Method   CIPP-UV trenchless
 Length   Any length is possible

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement