China factories

China factory - Daoyunai Energy Saving Technology Limited

Daoyunai Energy Saving Technology Limited

  • China,Shanghai ,Shanghai
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public
China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public

  1. China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public
  2. China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public
  3. China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public
  4. China Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public

Sewer Cured In Place UV CIPP Pipe Repair Equipment Private Households Public

  1. MOQ: 1 unit
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 20 units per month
Delivery Time 25 working days
Packaging Details Normal
Application Sewer rehabilitation
Composition Two Blowers, Cable, Video, Cure
Cable reel 150 meters
Power Energy Saving LED
Range DN200-1200
Color Blank or printed as required
Brand Name DAO
Model Number D919
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 20 units per month
Delivery Time 25 working days Packaging Details Normal
Application Sewer rehabilitation Composition Two Blowers, Cable, Video, Cure
Cable reel 150 meters Power Energy Saving LED
Range DN200-1200 Color Blank or printed as required
Brand Name DAO Model Number D919
Place of Origin Jiangsu, China
High Light cured in place pipe repaircipp sewer repairDAO ultraviolet curing equipments

Integrated CIPP UV repair equipment for private households and public pipelines

Pulling CIPP UV liner into the pipeline

 

1. Place the hoist on the wellhead to align the reel with the guide wheel, and the personnel at both ends can start the hoist to pull materials when they are ready.

2. During material delivery, ensure that the materials are folded neatly and are not scratched by foreign matters during material movement, especially at the wellhead and nozzle. (you can brush lubricant under the material to reduce the resistance of pulling the material).

3. The pulling speed shall be controlled within 5m/min.

4. If space permits, try to leave a certain distance between the steelhead and the pipe orifice to ensure that the finished incision is beautiful. When the material is approaching the end, do not pull too much, otherwise, it is very troublesome to pull the material backward. The hoist can be stopped when the material is pulled down to a proper position.

5. Remove the rope for pulling materials, rope tightener, lifting belt, universal shaft, and guide wheel, and put them back in the original place for next use. (when pulling the material, it is better to keep the material tight and observe whether the bottom film is pulled).

6. Repair the pipes of DN600 and below. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 600mm. Repair the pipes of DN600 and above. The length of the two ends of the inner liner extending out of the original pipe is about ≥ 1000mm.

It depends on the site conditions.

 

 Winch  Required 5T
 Speed  Within 5m/min
 Key points  slowly and carefully

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement