China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

  1. China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
  2. China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
  3. China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing
  4. China Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

Pvc Pipe Trenchless Point Repair Relining Protective Bottom Film Installing

  1. MOQ: 10m
  2. Price: Variable
  3. Get Latest Price
Payment Terms T/T
Supply Ability 340 km per year
Delivery Time 15 working days
Packaging Details Normal
Material Protective bottom film
Diameter DN400
Thickness 4mm
Length 160m
Weight Variable
Life 50 years
Brand Name DAO
Place of Origin Jiangsu, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 340 km per year
Delivery Time 15 working days Packaging Details Normal
Material Protective bottom film Diameter DN400
Thickness 4mm Length 160m
Weight Variable Life 50 years
Brand Name DAO Place of Origin Jiangsu, China
High Light trenchless pvc pipe repairtrenchless sewer reliningDAO underground trenchless machines

Protective bottom film installing for trenchless pipeline CIPP repair construction

 

Protective bottom film for UV trenchless operation

The protective bottom film plays a role in protecting the lining hose, preventing the lining hose from being scratched and damaged by protrusions during pulling in.

The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process. After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.

 

Important information:

The hardening rate depends on the geometry of the pipe, the wall thickness of the hose lining, the distance from the curing light source used to the lining pipe, the radiation intensity, etc., and is affected by the main conditions of the construction site (water, temperature, the material of the pipeline to be repaired, etc.). The above values are indicative of the maximum hardening rate.

If vinyl ester resin is used for hardening, the speed shall be reduced by 30-35%, and the pressure in the pipe is recommended to be between the specified minimum and maximum values.

The temperature resulting from curing shall be continuously between 80 ° C and 140 ° C maximum. If this level cannot be maintained under the set parameters, the hardening speed shall be adjusted to reach this level.

 

 How  Pulling
 Application  Rainstorm
 Length  Any length is possible

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2012

  • Total Annual:

    40000000-45000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world.   The product range covers four series and more than 20 models in ...

+ Read More

Get in touch with us

  • Reach Us
  • Daoyunai Energy Saving Technology Limited
  • Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
  • https://www.cipp-uv.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement