Payment Terms | T/T |
Supply Ability | 340 km per year |
Delivery Time | 15 working days |
Packaging Details | Normal |
Material | Lining sewers |
Diameter | DN300 |
Thickness | 3mm |
Length | 460m |
Weight | Variable |
Life | 50 years |
Brand Name | DAO |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
UV Sewer Lining Ultraviolet Curing Process Trenchless Water Line Repair Urban
Cure UV CIPP Lining Urban Rural Sewer Pipes Repair Cured In Place Pipe Lining
Drain Relining UV CIPP Construction renovation of potable water pressure pipes
Ultraviolet UV Cured Pipe Lining Plastic Underground Pipeline Rehabilitation
Product Specification
Payment Terms | T/T | Supply Ability | 340 km per year |
Delivery Time | 15 working days | Packaging Details | Normal |
Material | Lining sewers | Diameter | DN300 |
Thickness | 3mm | Length | 460m |
Weight | Variable | Life | 50 years |
Brand Name | DAO | Place of Origin | Jiangsu, China |
High Light | uv lining processing DAO ,DAO uv pipes coating ,DAO uv linings process |
UV light curing inner repair sewer liner by CIPP process no need digging
The UV light curing inner repair liner (hereinafter referred to as the liner) comprises the inner membrane, resin-impregnated glass fiber, outer membrane, and ultraviolet protective film from the inside to the outside.
1-Protective film: the plastic film on the outermost layer of the hose to protect the hose from ultraviolet radiation and avoid scratches during storage, transportation, pulling, etc.
2-Outer membrane: the plastic film on the second outer layer of the hose. The outer film material is a complete barrel film without the interface, which can better protect the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and make the resin evenly distributed when the hose is inflated.
3-Glass fiber fabric: the main part of the hose is used to absorb the curing glue, increasing the pipe's strength after curing.
4-Inner membrane: the plastic film at the innermost layer of the hose, which protects the resin impregnated with glass fiber braid from volatilization during the storage and transportation of the hose, and makes the resin as evenly distributed as possible when the hose is inflated. After the hose is cured, the inner membrane shall be pulled out of the inner liner.
How | Plugging |
Application | Rain storm |
Length | Any length is possible |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2012
Total Annual:
40000000-45000000
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ... Daoyunai Energy Saving Technology Limited has been committed to manufacturing trenchless CIPP UV cure systems with liners and CCTV inspection crawlers for underground pipelines to service customers all over the world. The product range covers four series and more than 20 models in ...
Get in touch with us
Leave a Message, we will call you back quickly!