Payment Terms | T/T, L/C |
Supply Ability | 200 Sets per Month |
Delivery Time | 30Works Dates |
Packaging Details | Wooden Case Package:1200*800*2200 |
Condition | Brand New |
Color | Metallic |
Voltage | 220V 50HZ |
Volume | 100-1000L |
Original | China |
Term | FOB |
Brand Name | UPPERBOND |
Model Number | O1 |
Certification | CE |
Place of Origin | China |
View Detail Information
Explore similar products
Automatic Molasses Tobacco Machine , High Speed 30 Bags / Min
Shisha / Molasses Filling Machine with Air-Pressure within Range 70 - 150gm
Shisha / Molasses / Tobacco Filling Machine with Air-Pressure in Range 150 -
High-speed Automatic Molasses Tobacco Packing Machine Overwrapper for Sticky
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 200 Sets per Month |
Delivery Time | 30Works Dates | Packaging Details | Wooden Case Package:1200*800*2200 |
Condition | Brand New | Color | Metallic |
Voltage | 220V 50HZ | Volume | 100-1000L |
Original | China | Term | FOB |
Brand Name | UPPERBOND | Model Number | O1 |
Certification | CE | Place of Origin | China |
High Light | tobacco packing machine ,molasses machine |
INTRODUCTION
This machine is customized by us for blending molasses tobacco more evenly. In order to agitate the mixture of cut tobacco, glycerin, molasses, flavors, etc., we need a very powerful agitating motor to ensure the mixing quality.
And because of that, we use a high performance motor to blend these stuffs to avoid motor break-down.
The tobacco molasses mixture is sticky, which is the reason why we put three shovels on the bottom of the mixing pot to erase sticky molasses to ensure the integrity of the mixture.
It has the hot steam and electrical heating sources. Also it can add the agitator and cover. All depend on clients.
This equipment consist of boiler body, stir device, tilting system, worm wheel and worm rod and the boiler body can be rotated within 180 degree.
All the materials in contact with media used stainless steel featuring good anticorrosion and durability which are in accordance with GMP standard.
If you have special requirements over the mixer, we can absolutely do it as per your requests
1. How About the Installation & Adjustment?
After the equipment arrived at the customer’s site, customers are responsible for unpacking and arranging the equipment in reference to the placement drawing or under our install-adjust technicians’ guidance. Costs of our staffs are decided at last.
2. How about the "Quality Assurance"
We are responsible for the faults and damages of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc.The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
3. How about the Warranty?
We offer 12 months maintenance period to the problems that caused by our design, manufacture, and material quality, and offer the relevant parts and effective services for free if the problems was caused by above reasons. We will offer a life-long technical support, after service for customers.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter,Seller
Year Established:
2007
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Get in touch with us
Leave a Message, we will call you back quickly!