Packaging Details | Nude packing |
Delivery Time | 30 days after receiving 30% deposit by T/T |
Payment Terms | L/C,T/T |
Supply Ability | 200 Unit/Units per Year |
Place of Origin | Tanan city, China |
Brand Name | CNHTC |
Certification | ISO9001 |
Model Number | TAZ5173TZJBZC350 |
View Detail Information
Explore similar products
truck mounted water well drilling rig TAZ5173TZJBZC350
Product Specification
Packaging Details | Nude packing | Delivery Time | 30 days after receiving 30% deposit by T/T |
Payment Terms | L/C,T/T | Supply Ability | 200 Unit/Units per Year |
Place of Origin | Tanan city, China | Brand Name | CNHTC |
Certification | ISO9001 | Model Number | TAZ5173TZJBZC350 |
Specifications:
Technical parameter |
|||||
Drilling depth(M) |
50 |
150 |
|||
Drilling diameter(mm) |
1500 |
500 |
|||
Speed of turntable(r/min) |
80.3,52.1,32.18.64,10.99,10.48((reverse) |
||||
Torque of turntable(KN.m) |
10.9,17.4, 30.7, 52.1, 54.8 (reverse) |
||||
Single rope lifting capacity of windlass(KN) |
30 |
||||
Lifting capacity of hook(KN) |
120 |
||||
Bearing capacity of mast (KN) |
150 |
||||
The height of mast (mm) |
7240 |
||||
Bearing weight(t) |
15 |
||||
Pipe |
Kelly(mm) |
182*182*5000 |
|||
Assistant pipe(mm) |
D168*8*3000 (screwed connection) |
||||
Hydraulic pump |
Model |
CB-E532 |
|||
Pump delivery(ml/r) |
32 |
||||
Rater speed (r/min) |
2000 |
||||
Rated pressure (MPa) |
16 |
||||
Mud pump |
Flux (m³/h) |
200 |
|||
Suction (m) |
7.5 |
||||
Delivery lift (m) |
26 |
||||
Speed (r/min) |
1450 |
||||
Power (KW) |
30 |
||||
Sewage pump |
6BS Sewage pump |
Flux (m³/h) |
280 |
||
Suction (m) |
7.5 |
||||
Delivery lift(m) |
18 |
||||
Speed (r/min) |
730 |
||||
Power (KW) |
30 |
||||
Match power |
Diesel engine |
Model |
NC4110ZG17-20 |
||
Rater power(KW) |
74 |
||||
s peed(r/min) |
2000 |
||||
weight(t) |
15 |
||||
Transport size (L*W*H)(mm) |
7144*2300*8315 |
||||
Working size(L*W*H)(mm) |
7460*2300*3060 |
||||
Walking speed does not be allowed more than second gear speed. |
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
1966
Total Annual:
20% - 30%
Employee Number:
10~100
Ecer Certification:
Site Member
Founded in 1966, lying at the foot of the famous Mountain Tai, an important skeleton enterprise being tech-reconstructed in 65, 75, 85 period by the nation, the Taian Taishan Jinshi Machine Co., Ltd(the primary Taian Experimental Equipment Factory) is a member of the gas engine in... Founded in 1966, lying at the foot of the famous Mountain Tai, an important skeleton enterprise being tech-reconstructed in 65, 75, 85 period by the nation, the Taian Taishan Jinshi Machine Co., Ltd(the primary Taian Experimental Equipment Factory) is a member of the gas engine in...
Get in touch with us
Leave a Message, we will call you back quickly!