Payment Terms | T/T |
Supply Ability | 35 sets per month |
Delivery Time | 5-8 work days |
Packaging Details | Standard export package |
Features | Attractive And Durable |
Size Tolerance | +/-0.05mm |
Quality Control | Inspected and Reconfirmed Before Shipment |
Fitness | 100% Match |
Mould Material | According to Customer's Requirements |
Use for | Car Shiny Interior Trim Parts |
Mould Base Standard | Hasco, Dme, Meusburger, Futaba, Lkm, etc |
Mould Price | Cost-Effective and Competitive |
After-Sales Service | 12 Months for Free |
Plastic material | ABS/PP/PS/PE/PVC/PA6/PA66 |
Brand Name | ERBIWA Mould |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
Customed Automotive Mold, Black Durable Auto Spare Parts For Car Rearview Mirror
Custom Plastic Injection Mould For Certificated Car Parts Front Fog Lamp Cover
Custom Auto Lighting System Car Parts Mold , Headlight Molding Parts
ABS Car Parts Mould , Black Panel Below Steering Wheel for Obstructing
Product Specification
Payment Terms | T/T | Supply Ability | 35 sets per month |
Delivery Time | 5-8 work days | Packaging Details | Standard export package |
Features | Attractive And Durable | Size Tolerance | +/-0.05mm |
Quality Control | Inspected and Reconfirmed Before Shipment | Fitness | 100% Match |
Mould Material | According to Customer's Requirements | Use for | Car Shiny Interior Trim Parts |
Mould Base Standard | Hasco, Dme, Meusburger, Futaba, Lkm, etc | Mould Price | Cost-Effective and Competitive |
After-Sales Service | 12 Months for Free | Plastic material | ABS/PP/PS/PE/PVC/PA6/PA66 |
Brand Name | ERBIWA Mould | Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
Greening the Future: The Road to Sustainable Manufacturing of Green Plastic Shell Injection Moulds
Part 1: Mould Description
IATF 16949 Certificated Injection Mould For Auto Interior Parts With Wood Look | |
Mold Type | Plastic injection mold, overmolding, Interchangeable Mold, insert molding, compression mold, stamping, die casting mold, etc |
Design software | UG, ProE, AutoCAD, Solidworks, etc |
Main services | Prototypes, mold design, mold making, mold tesing, low volume/high volume plastic production |
Certificate | ISO9001: 2015; IATF16949: 2016 |
Steel material | 718H, P20, NAK80, S316H, SKD61, etc |
Plastic production Raw material | PP, PA6, PLA, ABS, PE, PC, POM, PVC, PET, PS, TPE/TPR, etc |
Mold base | HASCO, DME, LKM, etc |
Mold runner | Cold runner and hot runner |
Mold hot runner | DME, HASCO, YUDO, etc |
Mold cold runner | Point way, side way, follow way, direct gate way, etc |
Mold strandard parts | DME, HASCO, etc |
Mold life | According to client's requirements |
Mold hot treatment | Quencher, nitridation, tempering, etc |
Mold cooling system | Water cooling or Beryllium bronze cooling, etc |
Mold surface | EDM, texture, high gloss polishing |
Hardness of the steel | 20~60 HRC |
Equipments | High speed CNC, standard CNC, EDM, Wire cutting, Grinder, Lathe, Milling machine, plastic injection machine |
Lead time | 35~55 working days |
Month Production | 50 sets per month |
Mold Packing | Standard exporting Wooden case |
Part 2: Mould Making Process
1 | Quotation | Need 2D/3D drawing or Samples |
2 | Mould Design | Mould design drawing could be sent for confirmation in one week after receiving the down payment |
3 | Mould Making | Start mould manufacturing only after the mould design is confirmed by customers |
4 | Mould Trial | 1st shot samples will be available for checking |
5 | Sample Confirmation | Customer to check and confirm samples |
6 | 2nd Payment | Customer need to pay for the 2nd payment once received the T1 shot samples |
7 | Mould Modification | Modify the mould if necessary |
8 | Mould Delivery | To deliver the mould after received the 3rd payment |
9 | After-Sales Service | Free of charge for 12 months warranty |
10 | Unpaid Balance | Customer need to pay for the balance after molds having been shipped out two months |
In today's global green transformation, ERBIWA Mould, as the industry's leading injection mould manufacturer, is leading the way to sustainable manufacturing of green plastic housing injection moulds, bringing a change in the industrial sector that is both environmentally friendly and economically beneficial. This article will provide an in-depth analysis of how ERBIWA Mould integrates green concepts into the product design and production process, achieving sustainable development in all aspects, from material selection to process optimisation.
Green materials: a commitment to environmental protection at the source
ERBIWA Mould understands that in order to achieve truly green manufacturing, we must start with material selection. The company prioritises the use of recyclable or biodegradable plastics as raw materials, such as Polylactic Acid (PLA) and Polyhydroxyalkanoate (PHA), which not only have a low carbon footprint during the production process, but also degrade naturally at the end of the product's lifecycle without causing lasting pollution to the environment. In addition, ERBIWA Mould is actively developing new material formulations to increase the recyclability and durability of materials and reduce dependence on virgin resources.
Lean manufacturing: process optimisation and energy efficiency
ERBIWA Mould is committed to lean production and energy efficiency in the manufacturing of injection moulds. Advanced mould design software is used to optimise the structure of the moulds and reduce material wastage, while ensuring high precision and long life of the moulds. In the injection moulding process, energy consumption is significantly reduced through precise temperature control and shortened cooling time. In addition, ERBIWA Mould has invested in energy-efficient injection moulding machines and automated production lines, which not only reduces manual errors, but also significantly reduces carbon emissions in the production process.
Circular economy: product design and recycling
ERBIWA Mould's design philosophy emphasises on the disassemblability and recyclability of its products, so that the green plastic shells can be easily disassembled after reaching the end of their service life, which facilitates the sorting and recycling of materials. The company works closely with the upstream and downstream industry chains to establish a green supply chain to ensure that waste plastics can be effectively collected and reprocessed into new raw materials, forming a closed-loop circular economic model that minimises waste and resource wastage.
Social Responsibility: Education and Initiatives
ERBIWA Mould recognises that promoting green manufacturing requires not only technological innovation but also a shift in social awareness. Therefore, the company actively participates in environmental education programmes to educate employees, customers and even the public about green manufacturing and to raise awareness of sustainable development. Through seminars and workshops, ERBIWA Mould shares its experience and achievements in green plastic housing injection moulds, encouraging more companies to join in green manufacturing.
Conclusion: Greening the Future for a Better Tomorrow
ERBIWA Mould's green plastic casing injection moulds are not only a sign of environmental responsibility, but also a commitment to future generations. Through continuous R&D investment and process innovation, ERBIWA Mould is gradually realising the dream of green manufacturing and setting a model of sustainable development in the industrial field. On the road to a green future, ERBIWA Mould is willing to work hand in hand with all partners to create a cleaner and more prosperous global home.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!