Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 30 Sets Per Month |
Delivery Time | 35-60 days |
Packaging Details | Standard export package |
Part Material | PP-PE TD20 |
Part Size | Customized |
Use For | Car Center Console Ventilator Rear Panel Parts |
Feature | Durable And High Performance |
OEM Service | Acceptable |
Mold Life | >300,000 Shots |
Mold Price | Cost-Effective |
Brand Name | Volkswagen |
Model Number | Customized |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
HASCO Standard High Polish Mirror Polish Plastic Auto Parts Mould
Durable Plastic Injection Molded Rear Lamp Base Cover With Highgloss Polish
Custom Plastic Auto Parts Mould , High Precision Automotive Head Lamp
Injection Plastic Auto Parts Mould For Attractive Finished Plastic Front Grille
Product Specification
Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 30 Sets Per Month |
Delivery Time | 35-60 days | Packaging Details | Standard export package |
Part Material | PP-PE TD20 | Part Size | Customized |
Use For | Car Center Console Ventilator Rear Panel Parts | Feature | Durable And High Performance |
OEM Service | Acceptable | Mold Life | >300,000 Shots |
Mold Price | Cost-Effective | Brand Name | Volkswagen |
Model Number | Customized | Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China | ||
High Light | automotive trim molding ,car trim molding |
VW Automotive Injection Mold Center Console Ventilator Rear Panel Parts
Part 1: About Us
ERBIWA Mould specializes in manufacturing common mold, metal inserted mold, bi-material injection mold, hot runner mold, overmold, etc. We provide all kinds of mould and mould customers from Germany, the United States, France, Britain, Spain, Italy, Russia, the Sweden, Switzerland, Canada, Austria and so on.
"High quality" and "Good service" is the base of ERBIWA business, because our mission is:
To Be One of the Best Industrial Suppliers.
Part 3: Mold Making Process
1 | Quotation | Need 2D/3D drawing or Samples |
2 | Mould Design | Mould design drawing could be sent for confirmation in one week after receiving the down payment |
3 | Mould Making | Start mould manufacturing only after the mould design is confirmed by customers |
4 | Mould Trial | 1st shot samples will be available for checking |
5 | Sample Confirmation | Customer to check and confirm samples |
6 | 2nd Payment | Customer need to pay for the 2nd payment once received the T1 shot samples |
7 | Mould Modification | Modify the mould if necessary |
8 | Mould Delivery | To deliver the mould after received the 3rd payment |
9 | After-Sales Service | Free of charge for 12 months warranty |
10 | Unpaid Balance | Customer need to pay for the balance after molds having been shipped out two months |
Part 4: Main Equipment List
Equipment type | Qty(Set) | Model | Brand |
Origin | Precision(μ) | Date of use (Year) | (x*y*z)mm |
Milling | 7 | 8SS | Taizheng | Taiwan | 0.01mm | 2014 | 600*320*330 |
4 | SHCM-97A | Gentiger | Taiwan | 0.01mm | 2016 | 650*350*360 | |
Grinding | 10 | SGM450 | Shuguang | Taiwan | 0.003mm | 2016 | 400*150*250 |
8 | JL-614 | Joen Lih | Taiwan | 0.003mm | 2012 | 400*150*250 | |
Drilling | 3 | Z305*16/1 | ZOJE | China | 1mm | 2016 | z=850 |
3 | M3-M16 | Xianwei | China | 1mm | 2016 | z=500 | |
EDM | 5 | cnc-edm-he130 | HSPK | China | 0.01mm | 2016 | 1300*600*400 |
8 | cnc-edm-he100 | HSPK | China | 0.01mm | 2016 | 1000*500*400 | |
6 | Sodick AM30L | Sodick | Japan | 0.005mm | 2014 | 300*200*200 | |
3 | TOPEDM MP50 | TOPEDM | Taiwan | 0.005mm | 2012 | 400*280*250 | |
4 | ARD M30 | ARD | Taiwan | 0.005mm | 2012 | 250*200*200 | |
Wire Cut | 2 | AQ360LS | Sodick | Japan | 0.005mm | 2010 | 360*250*220 |
3 | AQ550LS | Sodick | Japan | 0.005mm | 2010 | 550*350*320 | |
2 | Charmilles 240 | Charmilles | Switzerland | 0.003mm | 2010 | 250*200*220 | |
1 | CHMER | CHMER | Taiwan | 0.005mm | 2010 | 1300*600*400 | |
1 | K7 | K7 | China | 0.01mm | 2010 | 1000*500*400 | |
CNC | 5 | α-d14mia | FANUC | Japan | 0.005mm | 2016 | 500*400*330 |
3 | MXV1020 | YCM | Taiwan | 0.005mm | 2016 | 1020*520*540 | |
1 | MV66A | YCM | Taiwan | 0.005mm | 2016 | 660*520*540 | |
2 | FV85A | YCM | Taiwan | 0.005mm | 2016 | 850*620*630 | |
1 | FV125A | YCM | Taiwan | 0.005mm | 2016 | 1270*520*540 | |
1 | TV146B | YCM | Taiwan | 0.005mm | 2014 | 1400*620*630 | |
2 | Hartford-2150H | Hartford | Taiwan | 0.01mm | 2014 | 2000*1500*780 | |
1 | Hartford-1000 | Hartford | Taiwan | 0.01mm | 2014 | 1000*600*630 | |
2 | TAKUMI H16 | TAKUMI | USA | 0.01mm | 2017 | 1600*1300*700 | |
1 | MB-56VA | OKUMA | Japan | 0.005mm | 2014 | 1000*560*550 | |
1 | 5 Axis AV-2516X/2516HX | Quick Jet | Taiwan | 0.004mm | 2017 | 2500*1600*800 | |
1 | 3 Axis AV-1612 | Quick Jet | Taiwan | 0.002mm | 2017 | 1600*1200*700 |
Inspection
| 2 | Inspector | Hexagon | Sweden | 0.002mm | 2016 | 2000*1000*700 |
6 | Microscope | Micat | Taiwan | 0.002mm | 2016 | 400*300*150 | |
1 | Mitutoyo C7106 | Mitutoyo | Japan | 0.003mm | 2014 | 1500*800*500 | |
2 | MF-A1720 | Mitutoyo | Japan | 0.003mm | 2014 | 400*300*150 | |
1 | Micro-Hite M600 | TESA | Switzerland | 0.005mm | 2014 | 0~600mm | |
1 | GTR-4 LS | OSAKA | Japan | 0.005mm | 2014 | Gear Tester | |
1 | MFC1001 | NIKON | Japan | 0.003mm | 2015 | Z=100 | |
Injection Mold Machine | 4 | Haitian 100 Ton | Haitian | China | 2012 | 100T | |
1 | Haitian 180 Ton | Haitian | China | 2012 | 180T | ||
1 | Haitian 200 Ton | Haitian | China | 2012 | 200T | ||
4 | Taichung 120 Ton | Taichung | Taiwan | 2014 | 130T | ||
1 | Taichung 200 Ton | Taichung | Taiwan | 2014 | 200T | ||
1 | ARBURG 420C | ARBURG | Germany | 2016 | 110T |
Part 5: Photos Of Detailed Product
Kindly contact me if any questions. It is our pleasure to be on service of you.
We sincerely hope to cooperate with customers from home and abroad.
We promise to provide you cost-effective products and superior services, why not have a try?
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!