Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 set per month |
Delivery Time | 30-60 days |
Packaging Details | Standard export package |
Part Material | PC |
Product Size | Standard |
Use For | Car Air Intake Duct Cover |
Part Features | Durable and Eco-friendly |
Runner System: | Hot/Cold Runner |
Mold Material | Customized |
Mold Life | >300,000 Shots |
After-Sales Service | 12 Months For Free Charge |
Brand Name | Erbiwa Mould |
Model Number | Customized |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
Auto Interior Mold Durable ASA Material For Germany Auto Front Grille Accessorie
White PP-TD20 Plastic Injection Mold For Auto Engine Parts Air Inlet Filter
Auto Interior Trim Injection Mold For Car Air Condiationer Accessories For
ISO 9001 Automotive Injection Mold Auto Interior Trim Spare Parts With PP-GF20
Product Specification
Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 set per month |
Delivery Time | 30-60 days | Packaging Details | Standard export package |
Part Material | PC | Product Size | Standard |
Use For | Car Air Intake Duct Cover | Part Features | Durable and Eco-friendly |
Runner System: | Hot/Cold Runner | Mold Material | Customized |
Mold Life | >300,000 Shots | After-Sales Service | 12 Months For Free Charge |
Brand Name | Erbiwa Mould | Model Number | Customized |
Certification | ISO 9001: 2015 IATF 16949: 2016 | Place of Origin | Guangdong, China |
High Light | auto injection mold ,auto plastic injection molding |
Eco Friendly Auto Plastic Injection Molding Car Spare Parts Air Intake Duct Cover
ERBIWA Mould offers customers good quality console box mould and other automotive parts Mould, electrical appliances and electronics, household appliances, medical parts and so on.
We pursue for the ISO international standard service procedure and take part in the quality education system to realize the quality control. Our quality policy is “Quality first, customer oriented and high quality service”. We agree to the training and totally control the handling process to offer our old & new customers products with best & high quality, affordable price, high quality and top service.
For the console box mould, mould material: P20, 2316, 2738, 45c, 50c, 718H, 738H, etc.
Plastic material: PE, ABS, PP, PVC, POM, etc.
Mould base: LKM or self-made Cavity No.: Single/Multi /customized
During our years, we have developed a market for OEM and after-sales market for brand as: Mercedes-Benz, BMW, Audi, HONDA, NISSAN, TOYOTA and so on.
When matching of the product, R & D application and actual development, the Sino project department will make predicted examination and check on the items, such as making fast prototyping the sample, improving related and matching mould.
* ERBIWA Production Process
1 | Quotation | Need 2D/3D drawing or Samples |
2 | Mould Design | Mould design drawing could be sent for confirmation in one week after receiving the down payment |
3 | Mould Making | Start mould manufacturing only after the mould design is confirmed by customers |
4 | Mould Trial | 1st shot samples will be available for checking |
5 | Sample Confirmation | Customer to check and confirm samples |
6 | 2nd Payment | Customer need to pay for the 2nd payment once received the T1 shot samples |
7 | Mould Modification | Modify the mould if necessary |
8 | Mould Delivery | To deliver the mould after received the 3rd payment |
9 | After-Sales Service | Free of charge for 12 months warranty |
10 | Unpaid Balance | Customer need to pay for the balance after molds having been shipped out two months |
* ERBIWA Equipment List
Equipment type | Qty(Set) | Model | Brand |
Origin | Precision(μ) | Date of use (Year) | (x*y*z)mm |
Milling | 7 | 8SS | Taizheng | Taiwan | 0.01mm | 2014 | 600*320*330 |
4 | SHCM-97A | Gentiger | Taiwan | 0.01mm | 2016 | 650*350*360 | |
Grinding | 10 | SGM450 | Shuguang | Taiwan | 0.003mm | 2016 | 400*150*250 |
8 | JL-614 | Joen Lih | Taiwan | 0.003mm | 2012 | 400*150*250 | |
1 | SGM450 | KENT | Taiwan | 0.005mm | 2014 | 600*300*360 | |
Drilling | 3 | Z305*16/1 | ZOJE | China | 1mm | 2016 | z=850 |
3 | M3-M16 | Xianwei | China | 1mm | 2016 | z=500 | |
EDM | 5 | cnc-edm-he130 | HSPK | China | 0.01mm | 2016 | 1300*600*400 |
4 | cnc-edm-he100 | HSPK | China | 0.01mm | 2016 | 1000*500*400 | |
5 | cnc-edm-hp35 | HSPK | China | 0.01mm | 2016 | 350*250*300 | |
6 | Sodick AM30L | Sodick | Japan | 0.005mm | 2014 | 300*200*200 | |
3 | TOPEDM MP50 | TOPEDM | Taiwan | 0.005mm | 2012 | 400*280*250 | |
4 | ARD M30 | ARD | Taiwan | 0.005mm | 2012 | 250*200*200 | |
Wire Cut | 2 | AQ360LS | Sodick | Japan | 0.005mm | 2010 | 360*250*220 |
3 | AQ550LS | Sodick | Japan | 0.005mm | 2010 | 550*350*320 | |
2 | Charmilles 240 | Charmilles | Switzerland | 0.003mm | 2010 | 250*200*220 | |
1 | CHMER | CHMER | Taiwan | 0.005mm | 2010 | 1300*600*400 | |
1 | K7 | K7 | China | 0.01mm | 2010 | 1000*500*400 | |
CNC | 5 | α-d14mia | FANUC | Japan | 0.005mm | 2016 | 500*400*330 |
3 | MXV1020 | YCM | Taiwan | 0.005mm | 2016 | 1020*520*540 | |
1 | MV66A | YCM | Taiwan | 0.005mm | 2016 | 660*520*540 | |
2 | FV85A | YCM | Taiwan | 0.005mm | 2016 | 850*620*630 | |
1 | FV125A | YCM | Taiwan | 0.005mm | 2016 | 1270*520*540 | |
1 | TV146B | YCM | Taiwan | 0.005mm | 2014 | 1400*620*630 | |
2 | Hartford-2150H | Hartford | Taiwan | 0.01mm | 2014 | 2000*1500*780 | |
1 | Hartford-1000 | Hartford | Taiwan | 0.01mm | 2014 | 1000*600*630 | |
2 | TAKUMI H16 | TAKUMI | USA | 0.01mm | 2017 | 1600*1300*700 | |
1 | MB-56VA | OKUMA | Japan | 0.005mm | 2014 | 1000*560*550 |
Equipment type | Qty(Set) | Model | Brand |
Origin | Precision(μ) | Date of use (Year) | (x*y*z)mm |
Inspection
| 2 | INSPECTOR | Hexagon | Sweden | 0.002mm | 2016 | 2000*1000*700 |
6 | MICROSCOPE | Micat | Taiwan | 0.002mm | 2016 | 400*300*150 | |
1 | Mitutoyo C7106 | Mitutoyo | Japan | 0.003mm | 2014 | 1500*800*500 | |
2 | MF-A1720 | Mitutoyo | Japan | 0.003mm | 2014 | 400*300*150 | |
1 | Micro-Hite M600 | TESA | Switzerland | 0.005mm | 2014 | 0~600mm | |
1 | GTR-4 LS | OSAKA | Japan | 0.005mm | 2014 | Gear Tester | |
1 | MFC1001 | NIKON | Japan | 0.003mm | 2015 | Z=100 | |
Injection Mold Machine | 4 | Haitian 100 Ton | Haitian | China | 2012 | 100T | |
1 | Haitian 180 Ton | Haitian | China | 2012 | 180T | ||
1 | Haitian 200 Ton | Haitian | China | 2012 | 200T | ||
4 | Taichung 120 Ton | Taichung | Taiwan | 2014 | 130T | ||
1 | Taichung 200 Ton | Taichung | Taiwan | 2014 | 200T | ||
1 | ARBURG 420C | ARBURG | Germany | 2016 | 110T |
* Why Choose ERBIWA?
1. State-of-the-art production facilities and technology
2. Professional technical team in making different standard injection moulds
3. High quality and competitive price
4. Continuous service and technical support
5. Rich experience and skilled workers
6. Professional moulding designer
7. High quality, reliability and long product lifetime
8. Use eco-friendly material
9. A very strict quality controlling system
10. Timely packaging and delivery
* During Manufacturing We Can Offer:
1. Update production process by weekly report with pictures
2. Send video and photos to customers during mould test
3. Confirm packaging with customer before mould delivery
4. One year warranty, all maintenance are free of charge during warranty
* ERBIWA Product Show
RFQ is always welcome, we sincerely hope to cooperate with each customer from home and abroad.
Kindly contact me if any questions. It is our pleasure to be on service of you.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!