Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 set per month |
Delivery Time | 30-60 days |
Packaging Details | Standard export package |
Raw Material | PP |
Size | Standard |
Runner | Hot runner/Cold runner |
Cavity | Customized |
Mold Base | 1.1730,S50,S55C Etc |
Mold Core or Cavity | 1.2767,1.2343,S136 Etc |
Mold Standard | Customized |
Mold Life | 1 Million Shots |
Brand Name | Erbiwa Mould |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China |
Model Number | Customized |
View Detail Information
Explore similar products
HASCO Standard High Polish Mirror Polish Plastic Auto Parts Mould
Durable Plastic Injection Molded Rear Lamp Base Cover With Highgloss Polish
Custom Plastic Auto Parts Mould , High Precision Automotive Head Lamp
Injection Plastic Auto Parts Mould For Attractive Finished Plastic Front Grille
Product Specification
Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 set per month |
Delivery Time | 30-60 days | Packaging Details | Standard export package |
Raw Material | PP | Size | Standard |
Runner | Hot runner/Cold runner | Cavity | Customized |
Mold Base | 1.1730,S50,S55C Etc | Mold Core or Cavity | 1.2767,1.2343,S136 Etc |
Mold Standard | Customized | Mold Life | 1 Million Shots |
Brand Name | Erbiwa Mould | Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Guangdong, China | Model Number | Customized |
High Light | plastic injection molded parts ,automotive plastic moulding ,High Precision Auto Injection Mould |
High Precision Auto Injection Mould For Plastic Dashboard Cover Accessories
Why Choose Erbiwa Mould?
► Erbiwa Service:
We make the commitment of service as below:
1. Lead time: 4-7 weeks
2. Design period: 3-7 working days
3. E-mail reply: within 24 hours
4. Quotation: within 1-2 working days
5. Customer complaints: reply within 12 hours
6. Phone call service: 24H
► Erbiwa Advantage
1. Well trained staffs and advanced equipments
2. High quality but competitive price
3. Accept customization
4. Timely feedback and delivery
5. And outstanding customer service
► Erbiwa Plastic Auto Parts Mould Quality Control:
We have good QC system, covering IQC, OPQC, OQC
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking (hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- each part of mould’s size checking after machining according to 2D drawing
- mould testing (check mould running condition)
3. Check with customer’s requirement again before mould shipping.
We promise to provide you cost-effective items and superior services, why not have a try?
► Our Working Staffs:
► Products Show:
RFQ is always welcome, we sincerely hope to cooperate with every customer from home and abroad.
Kindly contact me if any questions. It is our pleasure to be on service of you.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!