Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 30 sets per month |
Delivery Time | 30-60 working days |
Packaging Details | Standard export package |
Part Material | ABS |
Part Size | According To Your Specifications |
Application | Car Central Console Air Conditioner Rear Panel |
Features | Durable And Stable |
Quality Control | 100% Inspection |
Mold Life | >300,000Shots |
Mold Stamdard | Based On Your Requirements |
Mold Price | Reasonable |
Brand Name | Erbiwa Mould |
Model Number | Customized |
Certification | ISO 9001: 2015 IATF 16949: 2016 |
Place of Origin | Dongguan, China |
View Detail Information
Explore similar products
HASCO Standard High Polish Mirror Polish Plastic Auto Parts Mould
Durable Plastic Injection Molded Rear Lamp Base Cover With Highgloss Polish
Custom Plastic Auto Parts Mould , High Precision Automotive Head Lamp
Injection Plastic Auto Parts Mould For Attractive Finished Plastic Front Grille
Product Specification
Payment Terms | TT, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 30 sets per month |
Delivery Time | 30-60 working days | Packaging Details | Standard export package |
Part Material | ABS | Part Size | According To Your Specifications |
Application | Car Central Console Air Conditioner Rear Panel | Features | Durable And Stable |
Quality Control | 100% Inspection | Mold Life | >300,000Shots |
Mold Stamdard | Based On Your Requirements | Mold Price | Reasonable |
Brand Name | Erbiwa Mould | Model Number | Customized |
Certification | ISO 9001: 2015 IATF 16949: 2016 | Place of Origin | Dongguan, China |
High Light | plastic injection molded parts ,automotive plastic moulding |
Part 1: ERBIWA Mould Description
Part 2: Mould Service Processing
1. Enquiry | Our customers send 2D drawing, 3D or samples of products to us. |
↓ | |
2. Quotation | According to the information customers sent ,we make an offer with mould feature(material, size, life, price, etc), payment, delivery time, package, etc |
↓ | |
3. Negotiation | All issues about mould, including mould feature, payment and so on |
↓ | |
4. Place an order | Sign Contract |
↓ | |
5. Mould Design | According to customers 3D or samples and requests to design the mould, before mould processing, we will send mould design to customer to confirm it |
↓ | |
6. Mould Test | We send the test sample to customer until meet customer's requests |
↓ | |
8. Delivery Way | Delivery by sea or by air, according to customers |
↓ | |
9. After-Sales Service | 12 Months warranty for free |
Part 3: ERBIWA Quality Control
We have good QC system, covering IQC, OPQC, OQC
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking (Hardness, flaw detection)
- Mould Standard Spare Parts Checking (hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- each part of mould’s size checking after machining according to 2D drawing
- mould testing (check mould running condition)
3. Check with customer’s requirement again before mould shipping
Part 4: Why Choose Us?
– We can Provide:
1. Professional and experienced workers
2. Advanced technology and equipment
2. Competitive price & OEM design
3. Design drawings for free
4. Injection mold production more than 15 years of experience
7. We use eco-friendly material
8. A very strict quality controlling system
9. Delivery on time
– And During Manufacturing We Will:
1. Update production process by weekly report with pictures
2. Send video and photos to customers during mould test
3. Confirm packaging with customer before mould delivery
4. One year warranty, all maintenance are free of charge during warranty
Part 5: Photos For Our Products
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!