Payment Terms | T/T |
Supply Ability | 200 pcs |
Delivery Time | 30~45 days |
Packaging Details | normal wooden case |
Shaping mode | Plastic Injection Mould |
Product material | PP,PU /PC /TPE /PP/nylon/POM/PMMA/PA and ect,ABS |
Product | Vehicle Mould,Plastic Injection Mould |
Design software | UG,CAD,Solidworks,Pro/E,AutoCAD |
Steel Hardness | 20~60 HRC |
Raw Material | P20, NAK80, H13, 8407, 2344, 718H, S316H, SKD61, etc. |
Brand Name | ERBIWA |
Model Number | EW230209 |
Certification | ISO9001:2015 |
Place of Origin | China |
View Detail Information
Explore similar products
Auto Interior Mold Durable ASA Material For Germany Auto Front Grille Accessorie
White PP-TD20 Plastic Injection Mold For Auto Engine Parts Air Inlet Filter
Auto Interior Trim Injection Mold For Car Air Condiationer Accessories For
ISO 9001 Automotive Injection Mold Auto Interior Trim Spare Parts With PP-GF20
Product Specification
Payment Terms | T/T | Supply Ability | 200 pcs |
Delivery Time | 30~45 days | Packaging Details | normal wooden case |
Shaping mode | Plastic Injection Mould | Product material | PP,PU /PC /TPE /PP/nylon/POM/PMMA/PA and ect,ABS |
Product | Vehicle Mould,Plastic Injection Mould | Design software | UG,CAD,Solidworks,Pro/E,AutoCAD |
Steel Hardness | 20~60 HRC | Raw Material | P20, NAK80, H13, 8407, 2344, 718H, S316H, SKD61, etc. |
Brand Name | ERBIWA | Model Number | EW230209 |
Certification | ISO9001:2015 | Place of Origin | China |
High Light | ABS Automotive Injection Mould ,H13 Automotive Injection Mould ,60 HRC Plastic Injection Molding |
Customized Automotive Injection Plastic Mold High Quality Plastic injection Molding
Company Name | ERBIWA Mould Industrial CO., LTD. |
Manufacturing | Tool and Mold Making |
Application | Plastic Mold, Silicone Mold, Die Casting Tool and Sheet Metal Stamping Tool, etc. |
Design Software | UG, ProE, AutoCAD, Solidworks, etc. |
Raw Material | P20, NAK80, H13, 8407, 2344, 718H, S316H, SKD61, etc. |
Steel Hardness | 20~60 HRC |
Inspection Tool | CMM, VMS, Caliper, High Gauge, Pin Gauge, Dial Indicator, Micrometer, Ruler, Tape, Tester, etc |
Mold Base | LKM, HASCO, DME, etc. |
Runner System | Cold runner system and Hot runner system |
Cavity Number | Single-cavity or Multi-cavities (As per customer’s requirement and part structure.) |
Ejection Techniques | Gas assisted, Pin ejection, Sleeve ejection, Bar ejection, Blade ejection, etc. |
Gate Type | Sprue gate, Edge gate, Sub-gate, Pin gate, Cashew gate, Themal gate, Valve gate, etc. |
Heat Treatment | Quenching, Nitriding, Tempering, etc. |
Cooling System | Liquid cooling or Beryllium bronze cooling, etc. |
Surface Treatment | High gloss, Matte, EDM, Texture, Hardening, Coating etc |
Mold Life | Class 101 – Life expectancy of +1,000,000 cycles. Class 102 – Life expectancy not to exceed 1,000,000 cycles Class 103 – Life expectancy under 500,000 cycles Class 104 – Life expectancy less than 100,000 cycles Class 105 – Life expectancy less than 500 cycles. |
Equipment | CNC Machining, EDM, Wire Cutting, Grinding, Lathe, Milling, Drilling, Tapping, Fitting, Polishing, etc |
Lead time | 3~6 weeks depends on complexity of the mold |
Place of Export | Dongguan China |
Our Strength
1. Professional ISO 9001: 2015 Certificated OEM And ODM Tooling Manufacturer.
2. TS16949 Certificated Moulding Manufacturer.
3. 3 Sets Of Doubble-Head EDM Machines To Improve The Working Accuracy And Efficiency.
4. EROWA Clamping System.
5. All Inquiries Will Be Quoted Within 24 Working Hours.
6. Familiar With HASCO, DME, MISUMI Standards.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2016
Total Annual:
3,200,000-5,000,000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i... 2021 ERBIWA Mould-Equipment List.pdf ERBIWA Mould Industrial Co., Ltd was established in 2016 in Changan Town, Dongguan City. It takes less than one hour from Shenzhen airport to our company. Therefore, our company has superior location and facilitated traffic and the logistics i...
Get in touch with us
Leave a Message, we will call you back quickly!