China factories

China factory - ACE Container & Parts Co., Limited

ACE Container & Parts Co., Limited

  • China,Tianjin ,Tianjin
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order

  1. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
  2. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
  3. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
  4. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
  5. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order
  6. China 10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order

10ft DNV 2.7-1 Offshore Container Equipment Lifting Frame Skid Made to Order

  1. MOQ: 1 pieces
  2. Price: $6,000.00/pieces 2-3 pieces
  3. Get Latest Price
Type offshore container
Length (feet) 10ft
Capacity 12 cbm
External Dimensions(l x W x H)(mm) 2991 x 2200 x 2200 mm
Internal Dimensions(l x W x H)(mm) 2700 x 2000 x 1900 mm
Color Customized
Material Corten-A
Age Brand new
CSC certified Yes
Sling DNV certified
Production Standard DNV2.7-1 and EN12079
Approval LR BV DNV certificate
Approval Area Offshore Oil and Gas Platform
Sling Angle 45 degree
Delivery Time within 30 days
Place of Origin Tianjin, China
Brand Name ACE

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Type offshore container Length (feet) 10ft
Capacity 12 cbm External Dimensions(l x W x H)(mm) 2991 x 2200 x 2200 mm
Internal Dimensions(l x W x H)(mm) 2700 x 2000 x 1900 mm Color Customized
Material Corten-A Age Brand new
CSC certified Yes Sling DNV certified
Production Standard DNV2.7-1 and EN12079 Approval LR BV DNV certificate
Approval Area Offshore Oil and Gas Platform Sling Angle 45 degree
Delivery Time within 30 days Place of Origin Tianjin, China
Brand Name ACE
Hot Sale Products
Product Description
DNV2.7-1 Lifting Frame Container Offshore
Structure Material: JIS SPA-H/ GB Q345D,E36
Corner Casting: SCW480
Welding Technique: Automatic TIG welding (Tungsten Inert Gas arc welding).
Surface treatment: Painted or Galvanized
Special for transportation and storage of offshore freight.
Meeting DNV 2.7-1 & EN12079 standard.
Classification Society: BV, LR, DNV certified
Design Temperature: -20°c
Top: Removable roof
With lifting pad eye

Customized Offshore Frame

DNV 2.7-1 Standard

Other Customized Frame

DNV 2.7-1 Standard

Customized Frame

DNV2.7-1 Standard


Product Datasheet
Type
DNV Offshore Frame
External Size
6.058 x 2.438 x 3.188(customized acceptable)
M
Internal Size
5.782 x 2.168 x 2.590(customized acceptable)
M
Top Opening ( L x W )
5.702 x 2.120
M
Inside Cubic Capacity
30.90
CBM
Maximum Gross Weight
12400
KGS
Tare Weight
3400
KGS
Maximum Payload
9000
KGS
Shackles
8.5
TON
Lifting Angle
45
degree
Packing & Delivery
DNV Offshore Frame Container Shipping

DNV 2.7-1 offshore frame containers has no package requirement.


We could arrange delivery to main ports near to you via Container Vessel or Bulk Shipping.

Our Company
ACE Container is a professional Container & Parts supplier in China, which has over 10 years experience in this line, 7 years Golden Member in Alibaba, Trade Assurance Service in Alibaba. Also ACE Container has exported products to over 85 countries. And we have got the approval of SGS.

• Our Main Business Line: All kinds of Dry Cargo Container, Reefer Container, Off shore Container, Dry Container Parts and Container Lashing Equipments.

• Our Main Market: USA, Canada, Southeast Asia, Australia, New Zealand, Middle East, Middle and West Europe.

Certifications
FAQ
1. Are your offshore frame container brand new?
Yes, we only do brand new offshore container.

2. Can we customize offshore frame as per our requirement?
Sure, we can do it as per your requirement.

3. Are there any certification and testing report for offshore frame?

Yes, there will be DNV2.7-1 certification issued by LR/BV, also have other testing report and certification. For example, NDT testing report, Size Testing, Loading inspection, Mill Certification, Welder Certification etc.

4. How to arrange the shipping?
For offshore frame, which will be shipped as SOC.

5. How about the production date?

It's about 55 days after getting your deposit.


Contact us

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2011

  • Total Annual:

    10000000-50000000

  • Employee Number:

    100~200

  • Ecer Certification:

    Verified Supplier

ACE Container & Parts Co., Ltd, formerly known as Tianjin ACE container yard, was established in 2001. Initially, our primary focus was on providing temporary stockpiling services for cargo and bulk items that were either soon to be exported or had just been unloaded from ships. In 2002, we expa... ACE Container & Parts Co., Ltd, formerly known as Tianjin ACE container yard, was established in 2001. Initially, our primary focus was on providing temporary stockpiling services for cargo and bulk items that were either soon to be exported or had just been unloaded from ships. In 2002, we expa...

+ Read More

Get in touch with us

  • Reach Us
  • ACE Container & Parts Co., Limited
  • Room 2009, South Business Building, No. 21-B, Innovation Pioneer Park, 4668 Xinbei Road, Marine Science Park, Binhai High-Tech Zone, Tianjin, China
  • https://www.cargoshipping-container.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement