Packaging Details | Wooden Case,plywood Case,pallet Etc. |
Delivery Time | about 15-45 days, accordingly |
Payment Terms | D/A, T/T, L/C,D/P |
Place of Origin | Jiangsu China |
Brand Name | JinYi |
Certification | CE ISO9001 |
Model Number | OEM |
View Detail Information
Explore similar products
Secondary Combustion Chamber For Steel Production Or Glass Manufacturing
OEM Secondary Combustion Chamber For Gas Turbine Engines
Product Specification
Packaging Details | Wooden Case,plywood Case,pallet Etc. | Delivery Time | about 15-45 days, accordingly |
Payment Terms | D/A, T/T, L/C,D/P | Place of Origin | Jiangsu China |
Brand Name | JinYi | Certification | CE ISO9001 |
Model Number | OEM | ||
High Light | post combustion chamber for Waste incinerators ,post combustion chambers for Waste incinerators ,Waste incinerators Secondary Combustion Chamber |
Secondary combustion chamber
A secondary combustion chamber, also known as a post-combustion chamber or afterburner, is a component commonly used in certain types of combustion systems. Its purpose is to further burn any unburned or partially burned fuel and combustible gases that remain in the exhaust gases from the primary combustion chamber.
The primary combustion chamber is where the initial combustion process takes place, typically in an engine or a furnace. However, in some applications, the combustion process may not be complete, resulting in the release of pollutants or unburned fuel into the exhaust stream. This is where the secondary combustion chamber comes into play.
The secondary combustion chamber provides a controlled environment where additional oxygen is introduced to facilitate the complete combustion of any remaining fuel and other combustible compounds. This is usually achieved by injecting additional air or other oxidizers into the exhaust gases. The increased oxygen concentration promotes a secondary combustion process, allowing for more complete combustion of the remaining fuel.
The flue gas generated after the regeneration of powdered carbon and granular carbon enters the secondary combustion chamber, and the
combustion chamber temperature is heated to above 1100°C through the burner in the secondary combustion chamber. Suitable high calorific value
liquid waste can be injected into the secondary combustion chamber instead of fuel, and the flue gas is The residence time of the secondary
combustion chamber exceeds 2 seconds, allowing the trace organic matter and dioxins in the flue gas to be fully decomposed and completely
burned, ensuring that the hazardous waste entering the exhaust system is fully burned
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2015
Total Annual:
1000000-100000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
The company is located in the economically developed Changzhou Economic Development Zone, with a registered capital of 20 million yuan. Mainly engaged in the research and development of environmental protection technology, the design of environmental protection projects (SNCR.SCR), the processing, p... The company is located in the economically developed Changzhou Economic Development Zone, with a registered capital of 20 million yuan. Mainly engaged in the research and development of environmental protection technology, the design of environmental protection projects (SNCR.SCR), the processing, p...
Get in touch with us
Leave a Message, we will call you back quickly!