Payment Terms | L/C, T/T, Western Union |
Delivery Time | 5-8Workdays |
Packaging Details | wooden case |
Product Name | TEE |
Material | 904L |
Size | 6'' |
Color | Sliver |
payment | T/T |
Stander | ANSI B16.9 |
Brand Name | METAL |
Model Number | 904L |
Certification | MTC |
Place of Origin | CHINA |
View Detail Information
Explore similar products
TOBO Flanges Butt Weld Fittings ASTM A182 F5 Steel Flange
Pipe Fittings Elbow Stainless Steel Tee Galvanized Pipe Fittings Silver Color
Monel 400 DN100 Seamless Pipe Fittings SCH40 Long Radius Type For Heat
SCH80 SMLS Nickel Alloy Pipe Elbow Alloy B3 N10675 90° LR DN80
Product Specification
Payment Terms | L/C, T/T, Western Union | Delivery Time | 5-8Workdays |
Packaging Details | wooden case | Product Name | TEE |
Material | 904L | Size | 6'' |
Color | Sliver | payment | T/T |
Stander | ANSI B16.9 | Brand Name | METAL |
Model Number | 904L | Certification | MTC |
Place of Origin | CHINA | ||
High Light | butt welded pipe fittings ,industrial pipe fittings ,butt weld tube fittings |
A403 WP317L /904L Stainless Steel Pipe Fittings Cap Tube End Caps Sch10s To Sch160 ASME B16.9
product name | A403 WP317L /904L Stainless Steel Pipe Fittings Cap Tube End Caps Sch10s To Sch160 ASME B16.9 |
size | 8-16mm |
material | carbon steel, stainless steel , as per customer's requirements. |
standard | DIN JIS ISO ASME ASTM BS |
samples | yes |
delivery time | within 7 days to 15days common according to quantity |
packaging | plastic bag inside and standard carton, pallet. According to client's demand |
payment ways | T/T, L/C,Western Union |
Brand Name | TOBO | |
Product Name | CAP | |
Certification | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED | |
Place of Origin | Shanghai China (Mainland) | |
Material |
ASTM | Carbon steel(ASTM A234WPB,,A234WPC,A420WPL6. |
Stainless steel(ASTM A403 WP304,304L,316,316L,321. 1Cr18Ni9Ti, 00Cr19Ni10, 00Cr17Ni14Mo2, ect.) | ||
Alloy Steel:A234WP12,A234WP11,A234WP22,A234WP5, A420WPL6,A420WPL3 | ||
DIN | Carbon steel:St37.0,St35.8,St45.8 | |
Stainless steel:1.4301,1.4306,1.4401,1.4571 | ||
Alloy steel:1.7335,1.7380,1.0488(1.0566) | ||
JIS | Carbon steel:PG370,PT410 | |
Stainless steel:SUS304,SUS304L,SUS316,SUS316L,SUS321 | ||
Alloy steel:PA22,PA23,PA24,PA25,PL380 | ||
GB | 10#,20#,20G,23g,20R,Q235,16Mn, 16MnR,1Cr5Mo, 12CrMo, 12CrMoG, 12Cr1Mo | |
Standard Specification | ASTM,JIS,BS,DIN,UNI etc. | |
Connection | Welding | |
Shape | Equal | |
Technics | Forged | |
Qualification | ISO9001, API,CE | |
Equipment | Pushing Machine,Beveling Machine,Sand Blasting Machine | |
Thickness | Sch10-Sch160 XXS | |
Size | 3/4"-6" | |
Surface of Finish | Antirust Oil,Hot Galvanized | |
Pressure | Sch5--Sch160,XXS | |
Standard | ASME,ANSI B16.9; DIN2605,2615,2616,2617,JIS B2311 ,2312,2313; EN 10253-1 ,EN 10253-2 | |
The third party inspection | BV, SGS, LOIYD, TUV, and other party alloyed by clients. | |
Remark | Also can supply IBR fittings and Specialized NACE & HIC Fittings | |
Marking | Registered logo,Heat Number,Steel Grade,Standard,Size | |
Minimum Order Quantity | 1pcs | |
Supply Ability | 3,0000pcs per month | |
Price | Depending on quantity | |
Payment Terms | T/T or Western Union or LC | |
Supply Ability | 3,0000pcs per month | |
Delivery Time | 10-50 days depending on quantity | |
Packing | PLY-wooden case or pallet or as for clients' requirements | |
Application | Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, | |
Advantages | 1. 20 + years of production experience at your service. 2. The fastest delivery 3. The lowest price 4. Most comprehensive standards and materials for your choice. 5. 100% export. 6. Our products EXPORT to Africa, Oceania, mid east, eastern Asia, Western Europe etc. | |
Special design available as the requirement of customer |
Specifications
Packaging Details
Plastic, Woven, Carton,Wooden.
According to your requirments.
Port Tianjin
Lead Time :
Quantity(Pieces) | 1 - 500 | >500 |
Est. Time(days) | 7 | To be negotiated |
Product Show
FAQ
We are manufacturer .
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
Company Details
Business Type:
Manufacturer,Agent,Importer,Exporter,Trading Company,Seller
Year Established:
1998
Total Annual:
100000-100000000
Employee Number:
200~300
Ecer Certification:
Verified Supplier
TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ... TOBO GROUP sales head offce in Shanghai. We are one of the Professional manufacturers Exporter Pipeline products in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area ...
Get in touch with us
Leave a Message, we will call you back quickly!