Payment Terms | L/C, T/T |
Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Steel material standard | Q235B/Q345B; |
Main Structure Parts | Welded 6mm~25mm thickness H beams & Round pipes |
Bracing Parts | 2.5mm thickness Galvanized C purlins & Steel Angles |
Surface Treatment | Grey Paint |
Clading Systerm | Colored Steel Sheet and FRP Lighting Tiles |
Drainage System | Galvanized water gutter & PVC Down Pipe |
Accessories | High Strength Bolt & Self-tapping Screw |
Loading | By 40 HQ Contianer |
Project Site | Ghana,Africa |
Steel Quantity | 250 metric tons |
Brand Name | SPDAR |
Model Number | 40m x 200m x 8m = 8000sqm |
Place of Origin | DONGGUAN, GUANGDONG, CHINA |
Certification | ISO, BS, ASTM |
View Detail Information
Explore similar products
Construction Steel Structure , 2 - floor Garage Steel Building Structures
Sand Blasting Steel Frame Industrial Garage With Aluminium Glass Sliding Windows
Recyclable Economical H/I Section Q355B/Q235B Garage Steel Structural Frame
H Shape Beam & Column Prefabraicted Garage Steel Frame For Office / Industrial
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days | Packaging Details | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Steel material standard | Q235B/Q345B; | Main Structure Parts | Welded 6mm~25mm thickness H beams & Round pipes |
Bracing Parts | 2.5mm thickness Galvanized C purlins & Steel Angles | Surface Treatment | Grey Paint |
Clading Systerm | Colored Steel Sheet and FRP Lighting Tiles | Drainage System | Galvanized water gutter & PVC Down Pipe |
Accessories | High Strength Bolt & Self-tapping Screw | Loading | By 40 HQ Contianer |
Project Site | Ghana,Africa | Steel Quantity | 250 metric tons |
Brand Name | SPDAR | Model Number | 40m x 200m x 8m = 8000sqm |
Place of Origin | DONGGUAN, GUANGDONG, CHINA | Certification | ISO, BS, ASTM |
High Light | galvanized steel frame ,garage steel buildings |
Building Steel Frame House , Agricultural Steel Framed Buildings
1. General Description
Garage Steel Frame / Steel Structure Factory use pre-fabricated steel H beams to build the main steel frames and use galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
2. Material Specification Datas for reference
No. | NAME | Steel Structure Warehouse |
1 | Size | length,width, eave height ,ridge height |
2 | Structure type | Single slope, double slope, muti slop |
3 | Single span, double-span, multi-span | |
4 | single floor, double floors...... | |
5 | Column | Q235, Q345 / S275/ S355 welded H section steel/ Box Section/ Trusse Section |
6 | Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
7 | Purlin | Q235 / Q345/ G450 C section or Z section |
8 | Knee brace | Q235 angle steel |
9 | Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
10 | Tie bar | Q235 steel pipe |
11 | Brace | Q235 round bar / angle |
12 | Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in different colors&gauge, can use steel or Aluminum or Stainless steel sheet |
13 | Partition wall | Sandwich panels (EPS, PU, Fiber glass wool etc.) available in different colors&gauges,can use steel or Aluminum or Stainless steel sheet |
14 | Roof and Wall | Option: EPS, fiber glass, rock wool or PU sandwich panel |
15 | Door | Fire proof Door, Rolling up Door( Steel or Aluminum or Stainless), Steel Sliding Door, |
16 | Window | Aluminum Alloy Frame with tempered glass( Sliding type ot Double-open ype) |
17 | Package Method | Fasten to a steel holder and steel wires before loading into container |
18 | Loading | 20 GP, 40HQ, 40 GP, 40 OT, Flat Container, 45HQ , and Bulk Ship |
3. Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
4.Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation at job site
5. Before sales service
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
BUILDING INFORMATION FORM | ||||||||
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form. | ||||||||
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane | |||||||
Building sketch |
6. After- Sales
We can offer you the whole set installation drawings for assembly conduction.
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!