Payment Terms | L/C, T/T |
Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | Packed in a iron holder and then by a container, |
Steel material standard | Q235B/Q345B; |
Main Structure Parts | Welded 6mm~25mm thickness H beams & Round pipes |
Bracing Parts | 2.5mm thickness Galvanized C purlins & Steel Angles |
Surface Treatment | Red primer + Grey paint Surface |
Clading Systerm | Colored Steel Sheet and FRP Lighting Tiles |
Drainage System | Galvanized water gutter & PVC Down Pipe |
Accessories | High Strength Bolt & Self-tapping Screw |
Loading | By 40 HQ Contianer |
Application | Poultry house, pig poultry farm shed |
Dimesions | Customers' Requirement |
Brand Name | SPDAR |
Model Number | 20m x 100m x 11m height 2 floors |
Place of Origin | DONGGUAN, GUANGDONG, CHINA |
Certification | ISO, BS, ASTM, AWS |
View Detail Information
Explore similar products
Poutltry Steel Framed Agricultural Buildings , Structural Steel H Beam with
Customsized Poultry Farm Structure , H Section Steel Structure Shed
Self - Tapping Screw Poultry Farm Structure Colored Steel Sheet
H Section Steel Poultry Farm Structure With Galvanized C Purlins For Pig Sheds
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days | Packaging Details | Packed in a iron holder and then by a container, |
Steel material standard | Q235B/Q345B; | Main Structure Parts | Welded 6mm~25mm thickness H beams & Round pipes |
Bracing Parts | 2.5mm thickness Galvanized C purlins & Steel Angles | Surface Treatment | Red primer + Grey paint Surface |
Clading Systerm | Colored Steel Sheet and FRP Lighting Tiles | Drainage System | Galvanized water gutter & PVC Down Pipe |
Accessories | High Strength Bolt & Self-tapping Screw | Loading | By 40 HQ Contianer |
Application | Poultry house, pig poultry farm shed | Dimesions | Customers' Requirement |
Brand Name | SPDAR | Model Number | 20m x 100m x 11m height 2 floors |
Place of Origin | DONGGUAN, GUANGDONG, CHINA | Certification | ISO, BS, ASTM, AWS |
High Light | farm buildings and structures ,industrial steel structures |
Pre - Fabricated Painting Galvanized Steel Structure Shed Lightweight
1. General Description
Poultry Farm Structure / Steel Structure Agriculture Products Trading Center use pre-fabricated steel H beams to build the main steel frames and use galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
2. Material Specification Datas for reference
Main Steel Frame | Column | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235/Q345/ G450 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rainspout | PVC | |
Live load on Roof | In 120kg/Sq.m (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Zinc rich epoxy painting, one primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
3.Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
4.Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation at job site
5. Before sales service
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
We will give you professional technical solution if you can fill this for and contact with us by e-mail, fax or tel which listed at the bottom of this form.
Compay Name: | |||||||
Client | Tel/Fax: | E-mail: | |||||
Building Basic Information | |||||||
Project: | Project No.: | ||||||
Location | Building Usage | Total area | |||||
Length (m) | Width (m) | Eave Height (m) | |||||
Roof material | |||||||
Wall material | |||||||
Design Load and Meteorological Conditions | |||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | |||||
Rainfall Capacity | Earthquake Grade | ||||||
Please fill out the below information if your building has the mezzine | |||||||
Height of Mezzanine(m) | Usage of mezzanine | ||||||
Live load on mezzanine(kn/m2) | |||||||
Please fill out the below information if your building has the crane | |||||||
Capacity (t) | Span (m) | Quantity | |||||
Hoisting height (m) | Other information about crane | ||||||
Building sketch | |||||||
6. After- Sales
We can offer you the whole set installation drawings for assembly conduction.
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!