Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | All steel members are put into one steel holder |
Size | Customized |
Drawing design | Tekla, PKPM,Auto-CAD |
Main-Steel Structure type | H / I Section |
Bracing Parts | Angles/ Steel Bar/Hollow Pipe/ U Channels/Hollow Section |
Purline | C & Z section |
Cladding System(wall & roof) | Single panel or Sandwich panel |
Processing method | Steel plate cutting & welding or Hot-rolled steel profiles |
Derusting | Ball blast |
Surface treatment | Painting or Hot-dip galvanized |
Connection | Bolts |
Brand Name | SPDAR , Hongfa |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco |
Place of Origin | Guangdong of China |
Model Number | 1500SQM |
View Detail Information
Explore similar products
C Section Large Span Steel Structures , Pre Engineered Steel Structures
Q355 Prefabricated Steel Warehouse
Excellent High Rise Building Structures For Garments Factory Or Shoes Factory
ISO Standard Larger Span Workshop Steel Structure Construction
Product Specification
Supply Ability | 10000 metric ton/month | Delivery Time | 15~45days |
Packaging Details | All steel members are put into one steel holder | Size | Customized |
Drawing design | Tekla, PKPM,Auto-CAD | Main-Steel Structure type | H / I Section |
Bracing Parts | Angles/ Steel Bar/Hollow Pipe/ U Channels/Hollow Section | Purline | C & Z section |
Cladding System(wall & roof) | Single panel or Sandwich panel | Processing method | Steel plate cutting & welding or Hot-rolled steel profiles |
Derusting | Ball blast | Surface treatment | Painting or Hot-dip galvanized |
Connection | Bolts | Brand Name | SPDAR , Hongfa |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco | Place of Origin | Guangdong of China |
Model Number | 1500SQM | ||
High Light | workshop steel buildings ,metal workshop buildings |
I Section Customized Workshop Steel Structure Galvanized Q345B & Q235B
Quick to fabricate
Easy to assemble
Long using time over 50 years
Low cost and maintenance
Environment friendly
Recyclable
Lighter weight
Excellent anti-shock and anti-impact ability
Application:
steel structure warehouse, workshop, hangar, garage, poultry house, container house, prefabricated home, high-rise building for office, shopping mall, hospital, dormitory, school, bus station, railway station, bridge, etc.
Components.
Main Steel Frame | Column | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235/Q345/ G450 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rainspout | PVC | |
Live load on Roof | In 120kg/Sq.m (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Zinc rich epoxy painting, one primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
Please contact with us, if you are planing to set up such buildings.
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!