Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | All steel members fasten to a steel rack |
Size | 4000sqm |
Drawing design | Tekla, PKPM,Auto-CAD |
Main-Steel Structure type | H / I Section |
Bracing Parts | Angles/ Steel Bar/Hollow Pipe/ U Channels/Hollow Section |
Purline | C & Z section |
Processing method | Steel plate cutting & welding or Hot-rolled steel profiles |
Cladding System(wall & roof) | Single panel or Sandwich panel |
Derusting | Ball blast |
Surface treatment | Painting or Hot-dip galvanized |
Connection | Bolts |
Material Standard | Q345,Q355,S355 |
Welding standard | BS or AWS |
Brand Name | SPDAR , Hongfa |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco |
Place of Origin | Guangdong of China |
Model Number | 4000sqm |
View Detail Information
Explore similar products
C Section Large Span Steel Structures , Pre Engineered Steel Structures
Q355 Prefabricated Steel Warehouse
Excellent High Rise Building Structures For Garments Factory Or Shoes Factory
ISO Standard Larger Span Workshop Steel Structure Construction
Product Specification
Supply Ability | 10000 metric ton/month | Delivery Time | 15~45days |
Packaging Details | All steel members fasten to a steel rack | Size | 4000sqm |
Drawing design | Tekla, PKPM,Auto-CAD | Main-Steel Structure type | H / I Section |
Bracing Parts | Angles/ Steel Bar/Hollow Pipe/ U Channels/Hollow Section | Purline | C & Z section |
Processing method | Steel plate cutting & welding or Hot-rolled steel profiles | Cladding System(wall & roof) | Single panel or Sandwich panel |
Derusting | Ball blast | Surface treatment | Painting or Hot-dip galvanized |
Connection | Bolts | Material Standard | Q345,Q355,S355 |
Welding standard | BS or AWS | Brand Name | SPDAR , Hongfa |
Certification | ISO9001:2008, AWS and BS EN ISO welding certificate by Singapore Setsco | Place of Origin | Guangdong of China |
Model Number | 4000sqm | ||
High Light | workshop steel buildings ,metal workshop buildings |
BS Standard Hot Dip Galvanized Prefabricated Workshop Steel Structure Materials
Description:
Quick to fabricate
Easy to assemble
Long using time over 50 years
Low cost and maintenance
Environment friendly
Recyclable
Lighter weight
Excellent anti-shock and anti-impact ability
Application:
steel structure warehouse, workshop, hangar, garage, poultry house, container house, prefabricated home, high-rise building for office, shopping mall, hospital, dormitory, school, bus station, railway station, bridge, etc.
Component :
No. | NAME | Steel Structure Warehouse |
1 | Size | length,width, eave height ,ridge height |
2 | Structure type | Single slope, double slope, muti slop |
3 | Single span, double-span, multi-span | |
4 | single floor, double floors...... | |
5 | Column | Q235, Q345 / S275/ S355 welded H section steel/ Box Section/ Trusse Section |
6 | Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
7 | Purlin | Q235 / Q345/ G450 C section or Z section |
8 | Knee brace | Q235 angle steel |
9 | Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
10 | Tie bar | Q235 steel pipe |
11 | Brace | Q235 round bar / angle |
12 | Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in different colors&gauge, can use steel or Aluminum or Stainless steel sheet |
13 | Partition wall | Sandwich panels (EPS, PU, Fiber glass wool etc.) available in different colors&gauges,can use steel or Aluminum or Stainless steel sheet |
14 | Roof and Wall | Option: EPS, fiber glass, rock wool or PU sandwich panel |
15 | Door | Fire proof Door, Rolling up Door( Steel or Aluminum or Stainless), Steel Sliding Door, |
16 | Window | Aluminum Alloy Frame with tempered glass( Sliding type ot Double-open ype) |
17 | Package Method | Fasten to a steel holder and steel wires before loading into container |
18 | Loading | 20 GP, 40HQ, 40 GP, 40 OT, Flat Container, 45HQ , and Bulk Ship |
Loading pictures
Installation Pictures
Please get in touch with me, if you are going to build such workshops.
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!