Payment Terms | L/C, D/A, D/P, T/T |
Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | Standard Sea transportation Packing, fasten to a steel rack by 40HQ/ 40OT. |
Main Structure | H Section |
Bracing parts | Round pipe/ Round bar/ Anlges |
Surface Treatment | Painting Or hot Dipped Galvanizing |
Main Material Standard | Q345/ Q355/ S355 |
Welding Standard | GB/ AWS/ BS |
Purline Material | Q345/ G450 |
Puline Zinc | Z100g~Z275g |
Purline Section | C section / Z section |
Installation Method | By bolts |
Water gutter | Galvainized Steel |
Water Pipe | PVC pipe |
Wall & Roof Color | c |
Brand Name | Hongfa |
Model Number | 5000squaremeter |
Certification | ISO9001:2015 |
Place of Origin | Guangdong, China |
View Detail Information
Explore similar products
Q235B/Q355B Warehouse Steel Structure Building Workshop Warehouse Building Frame
Q345B Warehouse Steel Structure For Stocking With Normal Paint Plus Color Steel
Small Warehouse Steel Structure / Light Steel Frame Construction
Q235B Warehouse Steel Structure With Yellow Crane Beam Recyclable
Product Specification
Payment Terms | L/C, D/A, D/P, T/T | Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days | Packaging Details | Standard Sea transportation Packing, fasten to a steel rack by 40HQ/ 40OT. |
Main Structure | H Section | Bracing parts | Round pipe/ Round bar/ Anlges |
Surface Treatment | Painting Or hot Dipped Galvanizing | Main Material Standard | Q345/ Q355/ S355 |
Welding Standard | GB/ AWS/ BS | Purline Material | Q345/ G450 |
Puline Zinc | Z100g~Z275g | Purline Section | C section / Z section |
Installation Method | By bolts | Water gutter | Galvainized Steel |
Water Pipe | PVC pipe | Wall & Roof Color | c |
Brand Name | Hongfa | Model Number | 5000squaremeter |
Certification | ISO9001:2015 | Place of Origin | Guangdong, China |
High Light | steel building warehouse ,steel frame warehouse |
Low Cost And Good Quality Prefabricated Steel Structure Warehouse And Workshop
Prefabricated steel structure Warehouseis a commercial building for storage or manufacture of goods, often have cranes and forklifts for moving goods around the structures. Prefabricated steel structure warehouse are utilized by manufactures, wholesalers, importers and manufacturers, etc.
Prefabricated steel structure warehouse requires fast and low-cost construction, without affecting the quality and durability now. Prefabricated steel structure warehouse adopts H type steel, C type steel and Z type steel to combine or build framework. Roof and wall are color compressing corragated steel sheet or color steel sandwich panel.
Prefabricated steel structure warehouse has basically substituted traditional reinforced concrete in developed country. It has many excellent characteristics like light weight, big span, fewer materials, low cost, saving basic, short building cycle, beautiful appearance, etc. It is widely applied to workshop, storage, garage, hangar, etc.
No. | NAME | Steel Structure Warehouse |
1 | Size | length,width, eave height ,ridge height |
2 | Structure type | Single slope, double slope, muti slop |
3 | Single span, double-span, multi-span | |
4 | single floor, double floors...... | |
5 | Column | Q235, Q345 / S275/ S355 welded H section steel/ Box Section/ Trusse Section |
6 | Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
7 | Purlin | Q235 / Q345/ G450 C section or Z section |
8 | Knee brace | Q235 angle steel |
9 | Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
10 | Tie bar | Q235 steel pipe |
11 | Brace | Q235 round bar / angle |
12 | Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in different colors&gauge, can use steel or Aluminum or Stainless steel sheet |
13 | Partition wall | Sandwich panels (EPS, PU, Fiber glass wool etc.) available in different colors&gauges,can use steel or Aluminum or Stainless steel sheet |
14 | Roof and Wall | Option: EPS, fiber glass, rock wool or PU sandwich panel |
15 | Door | Fire proof Door, Rolling up Door( Steel or Aluminum or Stainless), Steel Sliding Door, |
16 | Window | Aluminum Alloy Frame with tempered glass( Sliding type ot Double-open ype) |
17 | Package Method | Fasten to a steel holder and steel wires before loading into container |
18 | Loading | 20 GP, 40HQ, 40 GP, 40 OT, Flat Container, 45HQ , and Bulk Ship |
1. All the steel members prefabricated in the workshop
2. Loading by Normal container or Open top container
Or 40 Open top container
3, Install Steps-Fast Installation
If you or your friend or your customer are going to set up such building, welcome to send your information to us.
We will offer from design , manufacture, shipment to installation , whole set serivice.
Compay Name: | ||||||||
Client | Tel/Fax: | E-mail: | ||||||
Building Basic Information | ||||||||
Project: | Project No.: | |||||||
Location | Building Usage | Total area | ||||||
Length (m) | Width (m) | Eave Height (m) | ||||||
Roof material | ||||||||
Wall material | ||||||||
Design Load and Meteorological Conditions | ||||||||
Wind load (kn/m2) | Wind speed (m/sec) | Snow load (kn/m2) | ||||||
Rainfall Capacity | Earthquake Grade | |||||||
Please fill out the below information if your building has the mezzanine | ||||||||
Height of Mezzanine(m) | Usage of mezzanine | |||||||
Live load on mezzanine(kn/m2) | ||||||||
Please fill out the below information if your building has the crane | ||||||||
Capacity (t) | Span (m) | Quantity | ||||||
Hoisting height (m) | Other information about crane |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!