Payment Terms | L/C, T/T |
Supply Ability | 5000 metric tons |
Delivery Time | 5-8 work days |
Packaging Details | By 40 HQ container |
Application | Workshop, Warehouse, |
Type | Light Steel Frame |
Steel Grade | Q235,Q355 |
Main Structure | H Section |
Purlin | C.Z Shape Steel Channel |
Bracing | Round Pipes,Steel Angles |
Surface Treament | Anti-rust painting or Hot dipped galvanized |
Roofing & Wall | Sandwich panel or Single Steel Sheets |
Brand Name | Hongfa |
Model Number | HF-2680 |
Certification | ISO9001:2015 |
Place of Origin | China |
View Detail Information
Explore similar products
C Section Large Span Steel Structures , Pre Engineered Steel Structures
Excellent High Rise Building Structures For Garments Factory Or Shoes Factory
ISO Standard Larger Span Workshop Steel Structure Construction
Prefabricated Light Weight Workshop Steel Structure For 4 Storey Dormitory
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 5000 metric tons |
Delivery Time | 5-8 work days | Packaging Details | By 40 HQ container |
Application | Workshop, Warehouse, | Type | Light Steel Frame |
Steel Grade | Q235,Q355 | Main Structure | H Section |
Purlin | C.Z Shape Steel Channel | Bracing | Round Pipes,Steel Angles |
Surface Treament | Anti-rust painting or Hot dipped galvanized | Roofing & Wall | Sandwich panel or Single Steel Sheets |
Brand Name | Hongfa | Model Number | HF-2680 |
Certification | ISO9001:2015 | Place of Origin | China |
High Light | workshop steel buildings ,metal workshop buildings |
Professional Prefabricated Warehouse Steel with Metallic Roof Construction
Characters:
1. Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns.
2. Low cost: unit price range from USD35 to USD100/square meter FOB according to customer's request.
3. Fast construction and easy in installation
4. Long term service life: more than 50 years.
5. Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.
Main Structures in Container | |
Size | No longer than 11.8m |
Weight | 10~28 tons in each container |
Details | The heavy elements: loaded in 40ft OT or loaded in 40HC,40GP or 20GP with steel pallet by crane and forklift. |
The light elements: loaded in 40HC, 40GP or 20GP by hands. | |
Small parts: in bags or boxes in case lost | |
All the elements should be fixed or stable in the containers in case scratch or broken. |
No. | NAME | Steel Structure Warehouse |
1 | Size | length,width, eave height ,ridge height |
2 | Structure type | Single slope, double slope, muti slop |
3 | Single span, double-span, multi-span | |
4 | single floor, double floors...... | |
5 | Column | Q235, Q345 / S275/ S355 welded H section steel/ Box Section/ Trusse Section |
6 | Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
7 | Purline | Q235 / Q345/ G450 C section or Z section |
8 | Knee brace | Q235 angle steel |
9 | Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
10 | Tie bar | Q235 steel pipe |
11 | Brace | Q235 round bar / angle |
12 | Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in different colors&gauge, can use steel or Aluminum or Stainless steel sheet |
13 | Partition wall | Sandwich panels (EPS, PU, Fiber glass wool etc.) available in different colors&gauges,can use steel or Aluminum or Stainless steel sheet |
14 | Roof and Wall | Option: EPS, fiber glass, rock wool or PU sandwich panel |
15 | Door | Fire proof Door, Rolling up Door( Steel or Aluminum or Stainless), Steel Sliding Door, |
16 | Window | Aluminum Alloy Frame with tempered glass( Sliding type ot Double-open ype) |
17 | Package Method | Fasten to a steel holder and steel wires before loading into container |
18 | Loading | 20 GP, 40HQ, 40 GP, 40 OT, Flat Container, 45HQ , and Bulk Ship |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!