Payment Terms | L/C, T/T |
Supply Ability | 10000tons |
Delivery Time | 15 working days |
Packaging Details | loose packing, by 40HQ container |
Type | Light Steel Structure |
Application | Steel Structure Warehouse |
Material Grade | S355( Q355) |
Welding Standard | GB, ASTM, BS, DIN |
Main Structure | H Section Beams |
Purlines | C & Z Purlins |
Surface Treatment | Paint or Hot-dipped galvanized |
Cladding System | Colored Steel Sheets |
Door | Steel Sliding Door |
Window | Aluminum Alloy Glass window |
Drawing Design | AutoCAD |
Dimensions | Customer Request |
Brand Name | HONGFA |
Model Number | HF2021-1 |
Certification | ISO, BS |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Q235B/Q355B Warehouse Steel Structure Building Workshop Warehouse Building Frame
Q345B Warehouse Steel Structure For Stocking With Normal Paint Plus Color Steel
Small Warehouse Steel Structure / Light Steel Frame Construction
Q235B Warehouse Steel Structure With Yellow Crane Beam Recyclable
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000tons |
Delivery Time | 15 working days | Packaging Details | loose packing, by 40HQ container |
Type | Light Steel Structure | Application | Steel Structure Warehouse |
Material Grade | S355( Q355) | Welding Standard | GB, ASTM, BS, DIN |
Main Structure | H Section Beams | Purlines | C & Z Purlins |
Surface Treatment | Paint or Hot-dipped galvanized | Cladding System | Colored Steel Sheets |
Door | Steel Sliding Door | Window | Aluminum Alloy Glass window |
Drawing Design | AutoCAD | Dimensions | Customer Request |
Brand Name | HONGFA | Model Number | HF2021-1 |
Certification | ISO, BS | Place of Origin | CHINA |
High Light | S355 Steel Structure Warehouse ,Grey Color Paint Steel Structure Warehouse |
2021 New S355 Steel Structure Warehouse Building With Grey Color Paint
1. Main desgin: done by Chinese Steel structure engineers
2. Process method : CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
3. Advantages
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
4.THE SPECIFIC GOODS USUALLY INCLUDED IN A PROJECT
No. | Item | Description | |
Ⅰ | steel skeloton system | column,beam, roof bracing between rafter,bracing between column,roof and wall purline with sag rod,flange bracing | |
Ⅱ | fastening parts | anchor bolts,high-strength bolts,ordinary bolts | |
Ⅲ | roof and wall cladding system | roof and wall steel sheet,steel sandwich panel,heat-insulation materails,skylight,flashings and trims,gutter,downpipe,self-tapping screw,rivet,sealant,windows and doors etc. | |
Ⅳ | floor deck system | steel floor deck sheet,shear stud,steel edge formwork |
Building Models
5.Building Installation
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!