Payment Terms | L/C, T/T |
Supply Ability | 10000 metric ton/month |
Delivery Time | 30days |
Packaging Details | All Steel Members Are Put Into One Steel Holder,Load by 40HQ |
Application | Steel Workshop |
Dimensions | Customers'Requirment |
Service life | 50 years |
Drawing Design | AutoCad |
Main structure | Hot rolled H / I beam |
Purlin | C/ Z shape steel channel |
Bracing | Steel angles |
Accessories | High Strength Bolt & Self-tapping Screw |
Brand Name | HONGFA |
Model Number | HF033 |
Certification | GB/ T19001-2016/ ISO9001:2015 |
Place of Origin | GUANGDOGN, CHINA |
View Detail Information
Explore similar products
C Section Large Span Steel Structures , Pre Engineered Steel Structures
Q355 Prefabricated Steel Warehouse
Excellent High Rise Building Structures For Garments Factory Or Shoes Factory
ISO Standard Larger Span Workshop Steel Structure Construction
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 metric ton/month |
Delivery Time | 30days | Packaging Details | All Steel Members Are Put Into One Steel Holder,Load by 40HQ |
Application | Steel Workshop | Dimensions | Customers'Requirment |
Service life | 50 years | Drawing Design | AutoCad |
Main structure | Hot rolled H / I beam | Purlin | C/ Z shape steel channel |
Bracing | Steel angles | Accessories | High Strength Bolt & Self-tapping Screw |
Brand Name | HONGFA | Model Number | HF033 |
Certification | GB/ T19001-2016/ ISO9001:2015 | Place of Origin | GUANGDOGN, CHINA |
High Light | Workshop Q235 Prefabricated Steel Structure ,H Beam Prefabricated Steel Structure |
Cheap Cost Prefabricated Steel Structure Workshop
Steel structure building is made from welding H section steel as column and beam, some of them has crane beam, it's made from H steel beam too.Galvanized C ,Z section steel as wall purlin and roof purlin, Its wall and roof are made of metal steel sheet or sandwich panel. The door is electric shutter door or flat open door. Window is pvc or aluminum window. With the extensiveuse of steel structure,its advantages are increasingly significant compared with traditional building.
Characteristics
1). Free to design architectural drawings for you;
(2). Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
(3). Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
(4). Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
(5). Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
(6). Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.
No. | NAME | Steel Structure Warehouse |
1 | Size | length,width, eave height ,ridge height |
2 | Structure type | Single slope, double slope, muti slop |
3 | Single span, double-span, multi-span | |
4 | single floor, double floors...... | |
5 | Column | Q235, Q355 / S275/ S355 welded H section steel/ Box Section/ Trusse Section |
6 | Beam | Q235, Q355 / S275/ S355 welded H section steel/ Trusse Section |
7 | Knee brace | Q235 angle steel |
8 | Vertical and transversal support | Q235 angle steel, round bar or steel pipe |
9 | Tie bar | Q235 steel pipe |
10 | Brace | Q235 round bar / angle |
11 | Cladding system | EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in different colors&gauge, can use steel or Aluminum or Stainless steel sheet |
12 | Partition wall | Sandwich panels (EPS, PU, Fiber glass wool etc.) available in different colors&gauges,can use steel or Aluminum or Stainless steel sheet |
13 | Roof and Wall | Option: EPS, fiber glass, rock wool or PU sandwich panel or Light bricks |
14 | Floor | Galvanized Steel Floor Decking with Cement |
15 | Door | Fire proof Door, Rolling up Door( Steel or Aluminum or Stainless), Steel Sliding Door, |
16 | Window | Aluminum Alloy Frame with tempered glass( Sliding type ot Double-open ype) |
17 | Package Method | Fasten to a steel holder and steel wires before loading into container |
18 | Loading | 20 GP, 40HQ, 40 GP, 40 OT, Flat Container, 45HQ , and Bulk Ship |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!