Payment Terms | L/C, T/T |
Supply Ability | 10000 metric tons per month |
Delivery Time | 30days |
Packaging Details | loose packing, by 40HQ container |
Product Name | Steel Structure Workshop |
Application | Industry building |
Type | Light Steel Frame |
Grade | Q355,S355 |
Material | Low Carbon Steel |
Surface treatment | Hot dip Galvanised , Paint |
Drawing design | AutoCAD,PKPM |
Service life | 50 years |
Brand Name | HONGFA |
Model Number | HF033 |
Certification | GB/ T19001-2016/ ISO9001:2015 |
Place of Origin | DONGGUAN, GUANGDONG, CHINA |
View Detail Information
Explore similar products
C Section Large Span Steel Structures , Pre Engineered Steel Structures
Q355 Prefabricated Steel Warehouse
Excellent High Rise Building Structures For Garments Factory Or Shoes Factory
ISO Standard Larger Span Workshop Steel Structure Construction
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 metric tons per month |
Delivery Time | 30days | Packaging Details | loose packing, by 40HQ container |
Product Name | Steel Structure Workshop | Application | Industry building |
Type | Light Steel Frame | Grade | Q355,S355 |
Material | Low Carbon Steel | Surface treatment | Hot dip Galvanised , Paint |
Drawing design | AutoCAD,PKPM | Service life | 50 years |
Brand Name | HONGFA | Model Number | HF033 |
Certification | GB/ T19001-2016/ ISO9001:2015 | Place of Origin | DONGGUAN, GUANGDONG, CHINA |
High Light | Residential S355 Workshop Steel Structure ,Hot Dip Galvanised Workshop Steel Structure |
Hongfa steel structure warehouse has features of high fire resistance, strong corrosion resistance. Steel structure warehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.
The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
The usage scale includes large-scale workshop, or warehouse, supermarkets, entertainment centers and modular steel structure garage.
Specifications: | |||
1) Main Steel: | Q355, Q235, Q345B, Q235B etc. | ||
2) Column & Beam: | Welded or Hot rolled H-section | ||
3) Connection method of steel structure: | welding connection or bolt connection | ||
4) Wall & Roof: | EPS, Rockwool, PU sandwich, corrugated steel sheet | ||
5) Door: | Rolled up door or Sliding door | ||
6) Window: | Plastic steel or Aluminum alloy window | ||
7) Surface: | Hot dip galvanized or painted | ||
8) Crane: | 5MT, 10MT, 15MT and more | ||
Drawings & Quotation: | |||
1) Customized design is welcomed. | |||
2) In order to give you an exactly quotation and drawings, please let us know length, width, eave height and local weather. We will quote for you promptly. |
3. Characteristics
1. Different types and sizes according to customer's needs, large or small, wide span: single span or multiple spans, the max span is 36m without middle column.
2. Low cost and maintenance: unit price range from USD25/m2 to USD55/m2 according to customers request.
Fast construction and easy installation: time saving and labor saving,all the items are factory- made,pre-cut,pre-welded,pre-drilled,pre-painted.
4.Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!