Payment Terms | L/C, T/T |
Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days |
Packaging Details | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Usage | Warehouse for Shop and Storage |
Type | Light Structure Steel Warehouse |
Application | Storage, warehouse |
Welding Standrad | GB,ASTM,BS,DIN |
Material Grade | Q355B,Q235B |
Main Steel Frame | Prefabricated H beams |
Braing parts | rod bar, angles |
Purlines | C/Z Galvanized steel purlin |
Dimensions | Customized |
Design software | AutoCAD, Tekla Structures (X steel), PKPM |
Wall+roof | Single Color Steel Sheet |
Accesories | Bolts & Screws |
Brand Name | SPDAR |
Model Number | 5000smq |
Certification | ISO, BS, ASTM |
Place of Origin | DONGGUAN, GUANGDONG, CHINA |
View Detail Information
Explore similar products
Q235B/Q355B Warehouse Steel Structure Building Workshop Warehouse Building Frame
Q345B Warehouse Steel Structure For Stocking With Normal Paint Plus Color Steel
Small Warehouse Steel Structure / Light Steel Frame Construction
Q235B Warehouse Steel Structure With Yellow Crane Beam Recyclable
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 metric ton/month |
Delivery Time | 15~45days | Packaging Details | Packed in a iron holder and then by a container, normally 15tons ~25tons per 40HQ container, loading quantity according to member's shape and length |
Usage | Warehouse for Shop and Storage | Type | Light Structure Steel Warehouse |
Application | Storage, warehouse | Welding Standrad | GB,ASTM,BS,DIN |
Material Grade | Q355B,Q235B | Main Steel Frame | Prefabricated H beams |
Braing parts | rod bar, angles | Purlines | C/Z Galvanized steel purlin |
Dimensions | Customized | Design software | AutoCAD, Tekla Structures (X steel), PKPM |
Wall+roof | Single Color Steel Sheet | Accesories | Bolts & Screws |
Brand Name | SPDAR | Model Number | 5000smq |
Certification | ISO, BS, ASTM | Place of Origin | DONGGUAN, GUANGDONG, CHINA |
High Light | Q345 Warehouse Steel Structure ,Anti Impact Warehouse Steel Structure ,S275 Warehouse Steel Structure |
Large Span Warehouse By Hongfa Steel Group
1. General Description
Warehouse Steel Structure /Q345B Light Steel Structure Workshop Park use pre-fabricated steel H beams to build the main steel frames and use galvanized C & Z beams as the roof and wall purlin, cladding systerm can do the glass curtain wall , or aluminum curtain wall or use colored steel wall and roof , or can use FRP light tiles.
Quick to fabricate,Easy to assemble,
Long using time over 50 years,
Low cost and maintenance,
Environment friendly,
Recyclable,
Lighter weight,
Excellent anti-shock and anti-impact ability.
2. Material Specification Datas for reference
Main Steel Frame | Column | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section |
Beam | Q235, Q345 / S275/ S355 welded H section steel/ Trusse Section | |
Secondary Frame | Purlin | Q235/Q345/ G450 C and Z purlin |
Knee brace | Q235B Angle Steel | |
Tie Rod | Q235B Circular Steel Pipe | |
Brace | Q235B Round Bar | |
Vertical and Horizontal Support | Q235B Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof Panel | EPS Sandwich Panel / Glass Fiber Sandwich Panel /Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall Panel | Sandwich Panel / Corrugated Steel Sheet | |
Accessories | Window | Aluminium Alloy Window / PVC Window / Sandwich Panel Window |
Door | Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door | |
Rainspout | PVC | |
Live load on Roof | In 120kg/Sq.m (Color steel panel surrounded) | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Zinc rich epoxy painting, one primary painting, two finish painting (gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
3.Process method
CNC Steel plate cutting---- H Shape Forming ------ Welding By ARC Soldering Machine---- Straight/ Shape Fixing --- Joint Steel plate weld by manual--- Sand-blasting---- Paint Treatment Step----Loading Packing
4.Loading & Installation for reference
Loaidng in factory
Loading at the project site
Installation at job site
5. Before sales service
We have professional engineer teams to make the structural drawing and building drawing according to customer's requirements.
If you are planing to build a Garage Steel Frame Building, please send your requirements to me, and then we can give you the best solution.
6. After- Sales
We can offer you the whole set installation drawings for assembly conduction.
Also we have professional installation teams, if you need , we can offer the installation engineers to help you to conduct the whole buildings installation.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
1993
Total Annual:
>100,000,000
Employee Number:
>1000
Ecer Certification:
Active Member
Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen... Hongfa Steel Group, was founded in 1993, the headquarter is located in East Industrial Park of Dongguan City. As a large-scale leading Group, who has been Integrated by pre-fabricated steel structure materials manufacturing, design, installation, modular house fabricating, steel coil, processing cen...
Get in touch with us
Leave a Message, we will call you back quickly!