Payment Terms | L/C, T/T |
Supply Ability | 30 sets per 4 months |
Delivery Time | 2~4 months |
Packaging Details | pallets |
material | steel wire |
weight of each coil | 2tons |
phosphating film thickness | 4~20g/m2 |
phosphating time | 5~20min |
capacity | according to customer |
Brand Name | SUNTECH |
Model Number | HXLH |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Copper Electroplating Machine CCS Wire Production Line 5~300m/min
Water Treatment Make Pure Water Machine More Than 95% Ion Removal Rate
CCA/CCAM Wire Production Electroplating Machine Copper Coated
10μM Coating Thickness Barrel Electroplating Machine Adjustable
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 30 sets per 4 months |
Delivery Time | 2~4 months | Packaging Details | pallets |
material | steel wire | weight of each coil | 2tons |
phosphating film thickness | 4~20g/m2 | phosphating time | 5~20min |
capacity | according to customer | Brand Name | SUNTECH |
Model Number | HXLH | Place of Origin | CHINA |
High Light | 20min Phosphating Production Line ,4g/m2 Phosphating Production Line ,5min Phosphating Production Line |
Phosphating Production Line Acid Pickling Phosphating Line
1. Main parameters of phosphating production line
No | Item | Specification |
1 | material | steel wire |
2 | weight of each coil | 2ton |
3 | phosphating film thickness | 4~20g/m2 |
4 | phosphating time | 5~20min |
5 | capacity | according to customer |
2. Technological process of production
feeding→pickling→water rinsing→surface conditioning→phosphating→water rinsing→soaping→drying→put down
3. Main process introduction
Surface conditioning:the surface of the wire rod is treated in advance to refine and compact the phosphating film, improve the film forming property, shorten the phosphating time, reduce the film thickness, and eliminate the influence of the difference in the Surface states of the wire rod on the phosphating quality.
Phosphating:a uniformly thick phosphating film is formed on the surface of the wire rod as a carrier for adsorbing soap powder or lubricating liquid, which is convenient for subsequent drawing and use. It can be used as a lubricating layer or as a rust preventive layer.
4. Packaging & Shipping
We can pack it by pallet, or according to the customers' specific requirements.
Port: Shanghai/Ningbo
5. Our Services
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
All the machine of our company have already been widely used in steel wire area.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
8,000,000-20,000,000
Employee Number:
16~20
Ecer Certification:
Verified Supplier
Hangzhou Suntech Machinery Co.,Ltd. which is engaged in supplying machines for metal products and industrial automatic equipment, is a high-tech enterprise of Zhejiang province. Our powerful professional researching team has imported, digested and absorbed the most advanced technology of equipment o... Hangzhou Suntech Machinery Co.,Ltd. which is engaged in supplying machines for metal products and industrial automatic equipment, is a high-tech enterprise of Zhejiang province. Our powerful professional researching team has imported, digested and absorbed the most advanced technology of equipment o...
Get in touch with us
Leave a Message, we will call you back quickly!