Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 500Ton/Tons per Month |
Delivery Time | 50~100 Days |
Packaging Details | Iron Frame Package |
Condition | New |
Type | Natural Circulation/Once Through |
Usage | Industry/Power Station |
Structure | Fire/Water Tube |
Pressure | High/Low Pressure |
Style | Style |
Fuel | Coal/Gas/Oil-fired, Water Heat |
Output | Hot Water/Steam |
Dimension(L*W*H) | Customization |
Weight | 10~1000ton |
Brand Name | ORL Power |
Model Number | Customization |
Certification | ISO9001/SGS/TUV/ASME/EN |
Place of Origin | Zhangjiagang,Jiangsu,China |
View Detail Information
Explore similar products
Condensing Gas Boiler Water Wall Panels , Boiler Membrane Wall Tube
High Temperature 10 Ton Membrane Water Wall Panels
Boiler Water Wall Tubes
High Pressure CFB Boiler Water Wall Panels Water Tube ASME with Certification
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 500Ton/Tons per Month |
Delivery Time | 50~100 Days | Packaging Details | Iron Frame Package |
Condition | New | Type | Natural Circulation/Once Through |
Usage | Industry/Power Station | Structure | Fire/Water Tube |
Pressure | High/Low Pressure | Style | Style |
Fuel | Coal/Gas/Oil-fired, Water Heat | Output | Hot Water/Steam |
Dimension(L*W*H) | Customization | Weight | 10~1000ton |
Brand Name | ORL Power | Model Number | Customization |
Certification | ISO9001/SGS/TUV/ASME/EN | Place of Origin | Zhangjiagang,Jiangsu,China |
High Light | boiler water tube ,boiler panel |
Customized water wall panels for coal, biomass fired boiler
1. The introduction for boiler water wall panels
The diaphragm wall is also called the membrane type water wall. With a hose and flat steel welding of boiler furnace wall.
The size of each component according to the requirements of the whole looppipe group welding and become,
reoccupy welding seal between group and group when installation,make the furnace surrounded by a layer of the whole water wall closely surrounded by diaphragm.
2. Material compose
Material: generally is carbon steel and alloy steel.
The pipe diameter: 22-89 mm
water wall thickness: 2-13 mm
Flat steel width: 8-120 - mm
Flat steel thickness: 3 -- 12 mm
Machining process: there is submerged arc welding and gas shielded welding.
3. Water wall panels characteristic
The diaphragm wall of the furnace wall of protection is the most complete instead of refractory material, make the wall
thickness and weight are greatly reduced, simplify furnace wall structure, reduce the total weight of boiler's membrane
water wall has good air tightness, able to meet the requirements of positive pressure combustion of boiler,not easy slagging,
less air leakage, reduce exhaust smoke heat loss, improve the boiler thermal efficiency; By manufacturing welded components factory, install quickly and easily.
ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.
FAQ
1. Why choose us?
We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.
We ensure the deliver time, high quality, and the best after-sale service for you.
2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Total Annual:
$5000000-$10000000
Employee Number:
500~600
Ecer Certification:
Active Member
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ... Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...
Get in touch with us
Leave a Message, we will call you back quickly!