China factories

China factory - Suzhou orl power engineering co ., ltd

Suzhou orl power engineering co ., ltd

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Fire Tube / Water Tube Steam Power Plant Super Heater In Boiler
China Fire Tube / Water Tube Steam Power Plant Super Heater In Boiler

  1. China Fire Tube / Water Tube Steam Power Plant Super Heater In Boiler
  2. China Fire Tube / Water Tube Steam Power Plant Super Heater In Boiler

Fire Tube / Water Tube Steam Power Plant Super Heater In Boiler

  1. MOQ: 1 Set/Sets 10tons
  2. Price: Contact me | Get Latest Price
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days
Packaging Details Iron Frame Package
Name Boiler Super Heater
Feature High Efficiency
Usage Industry/Power Station
Structure Fire/Water Tube
Pressure High/Low Pressure
Style CFB Boiler
Fuel Coal/Gas/Oil-fired, Water Heat
Output Hot Water/Steam
Size Customized Size
Weight 10~1000ton
Brand Name ORL Power
Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN
Place of Origin Zhangjiagang,Jiangsu,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days Packaging Details Iron Frame Package
Name Boiler Super Heater Feature High Efficiency
Usage Industry/Power Station Structure Fire/Water Tube
Pressure High/Low Pressure Style CFB Boiler
Fuel Coal/Gas/Oil-fired, Water Heat Output Hot Water/Steam
Size Customized Size Weight 10~1000ton
Brand Name ORL Power Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN Place of Origin Zhangjiagang,Jiangsu,China
High Light fire tube super heatersteam power plant super heaterSGS super heater in boiler

Customized fire tube / water tube High Efficiency Boiler Super Heater In Steam Power Plant

 

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

 

Boiler Super Heater Description

 

The function of Super heater in the thermal power plant is to remove the last traces of moisture from the saturated steam coming out of boiler and to increase its temperature above saturation temperature as per requirement at inlet of steam turbine.

 

Differences

 

Type Advantages Disadvantages Supporting method
Pendant-type 1.Firm structural support 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. supported from above
Inverted-type 1.Proper drainage of the condensed steam 1. Lack the structural rigidity, especially in high speed gas flow Supported from below
Horizontal -type

1. Proper drainage

2. Good structural rigidity.

1. They do not view the flam directly so they are mainly from the convective type Usually supported in the vertical gas ducts parallel to the main furnace.

 
 
 
 
Boiler Super Heater Specification:
 

In power station boilers, the effect of superheaters is to heat the steam to certain temperature for higher efficiency of the power station. China wholesale boiler spare parts super heaters are steam superheaters to reheat the over-worked long-pressure or middle-pressure steam to certain temperature. The use of rehearters can further improve heat power of the power station circulating and control the steam temperature of the end blades of the steam turbine within allowed range. Zigzag superheaters and reheaters of the Company are also unique with rigorous production technique, first-class production flow line and complete test methods. This is the introduction of China wholesale boiler spare parts super heater.

 

The super-heater is the part of boiler that heats the steam from the saturation temperature to the overheating temperature.The super-heater consists of several parallel pipes and headers.

The super-heater can reduce the smoke exhaust temperature,recover the waste heat and improve the boiler efficiency.

Suzhou ORL Power Engineering Co., Ltd. is a modern enterprise which produces and sells complete sets of power equipment and accessories ,1T/h-660T/h boiler parts and accessories.With the advantages of scientific research,mass production,professional technical consultation,timely delivery and installation maintenance,our products are sold all over the world.

 

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

Application

 

use for heating saturated steam, steam temperature could be up to 900 degree C.

Superheater Capacity Upgrades to Increase Power Generation

 

Send us required technical data, such as steam capacity, presure, required temperature etc. We will design accordingly.

 

 

 

Boiler Parts

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

 

 

Boiler Product Test

 

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

Our products have been wildly used in power plants and large international companies overseas.

 

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

 

FAQ

 

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Total Annual:

    $5000000-$10000000

  • Employee Number:

    500~600

  • Ecer Certification:

    Active Member

    Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...     Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...

+ Read More

Get in touch with us

  • Reach Us
  • Suzhou orl power engineering co ., ltd
  • https://www.boiler-units.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement