China factories

China factory - Suzhou orl power engineering co ., ltd

Suzhou orl power engineering co ., ltd

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical
China Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical

  1. China Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical
  2. China Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical
  3. China Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical

Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical

  1. MOQ: 1 Set/Sets 10tons
  2. Price: Contact me | Get Latest Price
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days
Packaging Details Iron Frame Package
Condition New
Type Wallpapers
Usage Administration
Structure Fire/Water Tube
Pressure High/Low Pressure
Style customization
Color Customer's Requirement
Output Hot Water/Steam
Dimension(L*W*H) Customization
Weight 10~1000ton
Keywords Boiler Waterwall Panels
Application Biomass Boiler
Brand Name ORL Power
Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN
Place of Origin Zhangjiagang,Jiangsu,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days Packaging Details Iron Frame Package
Condition New Type Wallpapers
Usage Administration Structure Fire/Water Tube
Pressure High/Low Pressure Style customization
Color Customer's Requirement Output Hot Water/Steam
Dimension(L*W*H) Customization Weight 10~1000ton
Keywords Boiler Waterwall Panels Application Biomass Boiler
Brand Name ORL Power Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN Place of Origin Zhangjiagang,Jiangsu,China
High Light boiler water tubeboiler panel

Biomass Boiler Water Wall Panels ASTM For 230M Petroleum Boiler Metallurgical Industry
 

 
Description:
Petroleum Boiler Metallurgical Industry Biomass Boiler Waterwall Panel can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.
The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.
Hot-rolled steel plate produce
1.Hot-rolled plate, hot-rolled steel plate. Complete raw materials after the formation of smelting steel ingot, through the press forming process of ingot steel rolling heating.
2.Width is larger than 600mm(≥600mm), thickness is 0.35-200mm.
 
Applications:
The main Petroleum Boiler Metallurgical Industry Biomass Boiler Waterwall Panel is Widely used for power plant, power station, etc.
Hot rolled seamless steel tubes and cold rolled seamless steel tubes for steam boiler systems
1.Implementation of the same standard, medium and low pressure boiler tube standards can be used. Hot rolled or cold-rolled (drawn) seamless steel tubes with high quality carbon structural steel.
2.The 2 main 10, 20 steel manufacturing, in addition to ensure the chemical composition and mechanical properties of things do pressure test, curling, flaring and flattening test.
3.Hot rolling in hot rolling, cold rolling (DIAL) in heat treatment delivery.
3d wall panels is the unique product, it is the branded with several Invention patent and copyright ,also
has the intellectual property .
3d board /3d wall panels has been widely used for interior wall decoration and the public wall decoration .
Until now 3d board /3d wall panels has been exporting to more than 75 countries and areas, gained recognition from all our clients for our best service and quantity.
 
Specifications

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76 mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation location around the boiler combustion chamber

 
 
 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 
 
 
 
Company Information
 
 
 
Main Product 
 

 
Boiler Product Production
 
 
Boiler Product Test
Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection
 
Packaging & Shipping

 

 
Certifications
 
We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.
 
Company Business

Trading Process

Contact Information

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.boiler-units.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Total Annual:

    $5000000-$10000000

  • Employee Number:

    500~600

  • Ecer Certification:

    Active Member

    Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...     Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...

+ Read More

Get in touch with us

  • Reach Us
  • Suzhou orl power engineering co ., ltd
  • https://www.boiler-units.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement