Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"Customization Diesel Boiler Drum Thermal Insulation With Water Tube","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/a8\/80\/77f6c85cc5aef2bb49e22f25410c-200x200-1\/customization_diesel_boiler_drum_thermal_insulation_with_water_tube.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
{"title":"ORL Customized Anti shock gas hot water Boiler ASME Boiler Steam Drum","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/13\/35\/fd43fd1ae1d84c5c7052378af885-200x200-1\/orl_customized_anti_shock_gas_hot_water_boiler_asme_boiler_steam_drum.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
{"title":"800 Ton Energy Saving Industrial Boiler Double Drum","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/1c\/e9\/62f6529477837119f64ed3ec35f6-200x200-1\/800_ton_energy_saving_industrial_boiler_double_drum.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
{"title":"CFB Coal - Fired Steel 1000 Ton Boiler Steam Drum","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/8a\/c0\/8362e74c20414c51cadc977477f4-200x200-1\/cfb_coal_fired_steel_1000_ton_boiler_steam_drum.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
{"title":"Waste Heat Boiler High Pressure Drum , Boiler Unit ORL Power High Performance","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/32\/6a\/60a3488c983046cbbd2423f91897-200x200-1\/waste_heat_boiler_high_pressure_drum_2c_boiler_unit_orl_power_high_performance.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
{"title":"Cement industry steam boiler mud drum TUV drum type boiler","imgUrl":"https:\/\/img.silkroadsl.com\/nimg\/2b\/ea\/cdc0518b165bb001b00a45caa0a1-200x200-1\/cement_industry_steam_boiler_mud_drum_tuv_drum_type_boiler.jpg","attrs":{"Brand Name":"ORL Power","Model Number":"Customization","Certification":"ISO9001\/SGS\/TUV\/ASME\/EN","Place of Origin":"Zhangjiagang,Jiangsu,China"}}
Customization Diesel Boiler Drum Thermal Insulation With Water Tube
Product Description
Boiler Drum
In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes.
The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum.
ORL is a leading compamy of manufacturing industrial boilers, power plant boilers and boiler parts(including steam drum,waterwall panel,heater,economizer,evaporator,superheater,H-finned economizer,spirial fin tube,air preheater,fleu etc.)We supply clients with seamless steel tubes/pipes(ASME,EN or BS).
Service
ORL provides our customer with full range of services including boiler design,fabrication,installation and
commissioning,boiler maintenance,and supervision at site.Our pruduct and service include design and manufacture
industrial boilers,pressure vessels and tanks,and pressure parts for power plant boilers(600MW or 1000 MW).
Certificates
Verification Certificates of equipments:ISO 9001:2015; ISO4001:2015; ISO45001:2018; CE certificate; CNAS; IAF, etc.
Logistics
For 90% of shipment,we will go by sea,to all main continents such as Middle East,Africa,Oceania and Europe etc.Either by container or RORO/Bulk shipment.For neighborhood countries of China ,such as Mongolia,Kazzkhstan,Uzbekistan etc.we can ship by road or railway.
Customers
We are a professional manufacturer of industrial boilers inChina.With the scientific progressive conception of rapid introduction,we make our machinery cover all over the overseas market.We have been producing our goods with mature techniques and first-class quality.
Our pruducts have been wildly used in power plants and large international companies overseas.Such as USA,Brazil,Porto Rico,Guatemala,Spain,Demark,Norway,Turkey,India,Korea,Australia,Middle East,Southeast Asia etc.
FAQ
Q1:How long is the warranty period? We provide 18 months warranty for all spare parts(exclude fragile parts).
Q2:How do you control the quality? 1) All ORL machines are in strict accordance with the ISO quality and CE system requirements. 2) Each procedure is crafted by professional Skilled labour, followed by particular QC 3) All information of our products can be checked in efficient management system.
Q3:What certifications do you have? All our products are CE and ISO9001 certified. Numerous design and innovation patent for all our current models and spare parts.
Q4:What kind of service do you provide? Before sales: Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.
After sales: 1. Technical training on according to customer requirements; 2. We promise replacement under warranty; 3. We promise to supply the maintenance spare parts; 4. Regular call back or visit customers; 5. On time response to mail and phone calls of your complaints or consultation.
Q5:Are you a factory or trading company, where are you located? We are a factory, just 130km(2 hours by car) away from Shanghai Airport.We offer pickup service at Shanghai for your visit.
Contact Information
ADD: No.11, East Renmin Road, Zhangjiagang City, Jiangsu, China
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...