China factories

China factory - Suzhou orl power engineering co ., ltd

Suzhou orl power engineering co ., ltd

  • China
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Fire Proof Electrical Water Boiler Panel SA210C Boiler Components
China Fire Proof Electrical Water Boiler Panel SA210C Boiler Components

  1. China Fire Proof Electrical Water Boiler Panel SA210C Boiler Components
  2. China Fire Proof Electrical Water Boiler Panel SA210C Boiler Components
  3. China Fire Proof Electrical Water Boiler Panel SA210C Boiler Components

Fire Proof Electrical Water Boiler Panel SA210C Boiler Components

  1. MOQ: 1 Set/Sets 10tons
  2. Price: Contact me | Get Latest Price
  3. Get Latest Price
Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days
Packaging Details Iron Frame Package
Style Style
Condition New
Fuel Coal、Gas、Oil-fired, Water Heat
Output Hot Water、Steam
Dimension(L*W*H) Customization
Type Once Through、Natural Circulation
Weight 10~1000ton
Usage Industry、Power Station
Structure Fire、Water Tube
Pressure High、Low Pressure
Keywords boiler Water Boiler Panel
Product name Fire Proof Electrical Water Boiler Panel SA210C Boiler Components
Brand Name ORL Power
Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN
Place of Origin Zhangjiagang,Jiangsu,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 500Ton/Tons per Month
Delivery Time 50~100 Days Packaging Details Iron Frame Package
Style Style Condition New
Fuel Coal、Gas、Oil-fired, Water Heat Output Hot Water、Steam
Dimension(L*W*H) Customization Type Once Through、Natural Circulation
Weight 10~1000ton Usage Industry、Power Station
Structure Fire、Water Tube Pressure High、Low Pressure
Keywords boiler Water Boiler Panel Product name Fire Proof Electrical Water Boiler Panel SA210C Boiler Components
Brand Name ORL Power Model Number Customization
Certification ISO9001/SGS/TUV/ASME/EN Place of Origin Zhangjiagang,Jiangsu,China
High Light boiler water tubeboiler panel

Fire Proof Electrical Water Boiler Panel SA210C Boiler Components

 

Description

A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.

Our membrane water wall are manufactured with high grade raw material and contemporary production equipment at our advanced production unit. Various sizes, shapes and specifications, will meet all the requirements of our clients . Further, cargoes are delivered to the clients within lead time.

Specifications

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76 mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation location around the boiler combustion chamber

Related Products

 

Name&Type Supply Ability: FOB Price
Boiler drum 100Ton/Tons per Month Contact Me Get Latest Price
Boiler header 100Ton/Tons per Month Contact Me Get Latest Price
Boiler waterwall panel 500Ton/Tons per Month Contact Me Get Latest Price
Boiler economizer 500Ton/Tons per Month Contact Me Get Latest Price
Boiler super heater 300Ton/Tons per Month Contact Me Get Latest Price
Boiler air preheater 300Ton/Tons per Month Contact Me Get Latest Price
Other 300Ton/Tons per Month Contact Me Get Latest Price

 

 

 

 

Company Information

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

Main Product 

 

 

Boiler Parts

 

Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater

 

 

Boiler Parts

 

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube

 

 

Production Workshop

Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

 

Testing Center

 

 

 

Packaging & Shipping

 

 

 

 

Certifications

 

 

We have our boiler manufacturing plant, and obtain ISO9001:2008, ISO3834, ASME S, U and GB stamp.

 

Company Business

Our products have been wildly used in power plants and large international companies overseas.

 

Such as USA, Brazil, Porto Rico, Guatemala, Spain, Demark, Norway, Turkey, India, Korea, Australia, Middle East, Southeast Asia etc.

 

Trading Process

 

 

ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

 

FAQ

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

 

Contact Information

  1. ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  2. Phone:+86 0512-56770166
  3. E-mail: info@orlpower.com
  4. Website: http://www.orlpower.com

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Total Annual:

    $5000000-$10000000

  • Employee Number:

    500~600

  • Ecer Certification:

    Active Member

    Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...     Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province. ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin ...

+ Read More

Get in touch with us

  • Reach Us
  • Suzhou orl power engineering co ., ltd
  • https://www.boiler-units.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement