China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption
China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption

  1. China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption
  2. China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption
  3. China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption
  4. China SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption

SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption

  1. MOQ: 3 TONS
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms 30% after contract and balance 70% before shipment, or 100% L/C at sight
Supply Ability 100 tons/Month
Delivery Time Depands on Qty
Packaging Details Iron frame Packing
Pressure Low/High Pressure
Material Carbon Steel/Stainless Steel
Type Horizontal
Inlet Temperature 150-300℃
Boiler Capacity 1T-10T
Surface Treat Painted
Application Boiler System
Production Standard ASME, EN, GB
Brand Name HD Boiler
Model Number Boiler economizer
Certification ASME, ISO9001:2015, ISOEN3834
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms 30% after contract and balance 70% before shipment, or 100% L/C at sight Supply Ability 100 tons/Month
Delivery Time Depands on Qty Packaging Details Iron frame Packing
Pressure Low/High Pressure Material Carbon Steel/Stainless Steel
Type Horizontal Inlet Temperature 150-300℃
Boiler Capacity 1T-10T Surface Treat Painted
Application Boiler System Production Standard ASME, EN, GB
Brand Name HD Boiler Model Number Boiler economizer
Certification ASME, ISO9001:2015, ISOEN3834 Place of Origin China
High Light Reducing Fuel Consumption Boiler Parts EconomizerSA213 Boiler Parts EconomizerAlloy Steel economiser in boiler

SA213 T11 Alloy Steel Boiler Parts Economizer Reducing Fuel Consumption

 

Product Description

 

        The economizer is the heating surface in the flue at the tail of the boiler that heats the boiler water supply into saturated water under the pressure of the steam drum. Its main working principle is that the waste heat in the flue gas is transferred to the boiler feed water by using the principle of heat exchange, specifically, the flue gas enters the economizer from the tail of the boiler, and the economizer tube group connected in parallel in the boiler system make the heat exchange. Through heat exchange, the flue gas temperature is lowered and the boiler feed water is heated at the same time. After the heated feed water enters the boiler, it can reduce fuel consumption and improve the efficiency of the boiler.

 

 

Parameters

 

Description

Boiler economizer

Material

Alloy steel, Carbon steel, SA210C ,SA213T22, etc.

Material standard

ASTM, EN or ISO etc.

Dimension

Customization

Weight

Min: 10 ton

Max.:1000 ton

Smelting Process:

EF+LF + VD

Process

Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection

UT standard

ASTM A388 or EN10228, etc

 

 

Features

 

  • Brand Name: HD Boiler
  • Model Number: Boiler Economizer
  • Place of Origin: China
  • Certification: ASME, ISO9001:2015, ISOEN3834
  • Minimum Order Quantity: 3 TONS
  • Price: negotiable
  • Packaging Details: Iron frame Packing
  • Delivery Time: Depends on quantity
  • Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight
  • Supply Ability: 100 tons/month
  • Material: Carbon Steel
  • Placement: Before ESP or Before FGD
  • Packing: Iron Frame Package
  • Usage: Power Station
  • Inlet Temperature: 150-300℃

 

 

Function

 

1. Absorb the heat of low-temperature flue gas, reduce the exhaust temperature, reduce the exhaust loss, and save fuel.

2. Because the feed water is heated in the economizer before entering the steam drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the evaporation heating surface with high cost.

3. When the feed water temperature increases, the wall temperature difference will be reduced when it enters the steam drum, and the thermal stress will be reduced accordingly, prolonging the service life of the steam drum.

 

 

Energy-saving principle

 

        Add a reheating process to the cycle. Increase the average temperature of endothermy. This increases the efficiency of the cycle. During the start-up process of the boiler (drum boiler), because the circulation of its steam-water pipeline is not established, that is, the boiler feed water is in a stagnant state, and the water in the economizer is in a state of non-flow at this time. With the strengthening of boiler combustion and the increase of flue gas temperature, the water in the economizer is easy to vaporize, so that the part of the economizer is in an overtemperature state. In order to avoid this situation, a pipe is connected from the centralized sewer pipe of the steam drum to the inlet of the economizer as a recirculation pipe, so that the water in the economizer is in a flowing state to avoid its vaporization.

 

 

Packaging and Shipping

 

        Boiler Economizer will be packaged using high-quality materials to ensure the safety and protection of the product during transportation. The packaging materials will be sturdy and durable, able to withstand rough handling and long-distance shipping.

The product will be carefully packed and cushioned to prevent any damage during transit. It will also be labeled with clear instructions and handling guidelines for easy identification and handling.

        For shipping, we will use reliable and reputable carriers to ensure timely delivery of the product to our customers. We offer various shipping options depending on the destination, including air, sea, and land transportation.

        Our team will also provide tracking information for customers to track their orders and ensure a smooth delivery process. We are committed to delivering the Boiler Economizer in perfect condition and on time.

        Thank you for choosing our product. We look forward to providing you with the best packaging and shipping experience for your Boiler Economizer.

 

 

Why Choose Our Boiler Economizer?

 

  • High-quality stainless steel material for durability
  • Innovative design for maximum energy savings
  • Easy installation and maintenance
  • Advanced control systems for efficient operation
  • Suitable for various types of power plants
  • Handles high inlet temperatures

 

Contact Us

        If you are looking for a reliable and high-quality Boiler Economizer, look no further than HD Boiler. Contact us today to learn more and to place your order!

 

 

FAQ

 

  • Q: What is the brand name of this product?

A: The brand name of this product is HD Boiler.

  • Q: What is the model number of this product?

A: The model number of this product is Boiler economizer.

  • Q: Where is this product made?

A: This product is made in China.

  • Q: What certifications does this product have?

A: This product is certified by ASME, ISO9001:2015, and ISOEN3834.

  • Q: What is the minimum order quantity for this product?

A: The minimum order quantity for this product is 3 tons.

  • Q: Is the price negotiable for this product?

A: Yes, the price for this product is negotiable.

  • Q: How is this product packaged?

A: This product is packaged in iron frames.

  • Q: What is the delivery time for this product?

A: The delivery time for this product depends on the quantity ordered.

  • Q: What are the payment terms for this product?

A: The payment terms for this product are 30% after contract and balance 70% before shipment, or 100% L/C at sight.

  • Q: What is the supply ability for this product?

A: The supply ability for this product is 100 tons per month.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement