China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection
China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection

  1. China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection
  2. China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection
  3. China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection
  4. China Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection

Submerged Arc Welding Water Wall Tubes In Boiler 100% Penetrant Inspection

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 Tons / Month
Delivery Time 50 Days
Packaging Details Iron Frame Package
Material Alloy steel or Carbon steel
Name Boiler Water Walls
Inspection PT,RT,MT
Fuel Coal
Welded junction Manual or Automatic welding
Circulation Type Natural Circulation
Brand Name HD BOILER
Model Number Furnace wall
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 Tons / Month
Delivery Time 50 Days Packaging Details Iron Frame Package
Material Alloy steel or Carbon steel Name Boiler Water Walls
Inspection PT,RT,MT Fuel Coal
Welded junction Manual or Automatic welding Circulation Type Natural Circulation
Brand Name HD BOILER Model Number Furnace wall
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin Zhangjiagang,China
High Light boiler water wall panelsboiler water wall tubes

Panel bending turning radious press forming boiler water wall panel 100% penetrant inspection

 

Description

 

1 Membrane walls were originally introduced for land power stations and are being increasingly used in marine boilers.
2 Originally, experience gained when making the lower parts of furnaces sufficiently tight to hold liquid ash, proved that this could be done by welding in steel strips between the floor tubes.
3 Further development of this technique resulted in completely gas-tight furnace wall panels being constructed by welding together either finned tubes or normal tubes with steel strip interspaced between them.

 

Basic panel characteristics

 

-Max.length of a membrane wall:20000mm
-Diameter of tubes:Customized

-Width of fin:Customized

-Welding type:submerged arc welding
-Min.bending radius:Press forming,lower than D

 

Relevant data

 

1 Calibraion machine which ensures straightening of strip steel.
2 Bending of membrane walls is provided the panel bending machine.
3 If necessary,membrane walls are heat treated in an electrical furnace.

 

Corrosion protection

 

1 Improving boiler performance and reliability is an ongoing challenge for boiler operations maintenace teams.
2 In addition to our shop cladding facility we provide onsite weld overlay services to our global client base, protecting boilers and components from corrosion and erosion by applying our weld overlay solutions, often in harsh and challenging environments.
3 With continued focus on safety,quality and ever demanding schedules,our highly skilled teams have executed numerous projects on waste-to-energy and biomass plants,reducing maintenance costs by providing an effective boiler protection.

 

Function

 

1 Water walls are used in water tube boilers to contain the heat of the furnace and reduce the amount of refractory material required.
2

They also contribute to the evaporation rate by receiving radiant heat; indeed, in radiant heat boilers the water walls provide the bulk of steam generation.

 

Advantages

 

1 The walls for the entire furnace and, if necessary, the convection sections can be prefabricated in the shop.
2 They are stronger and more gastight than any other type.
3 Maintenance is low as refractories are practically eliminated.
4 Water washing of furnace walls and tube banks is facilitated.
5 The gas-tightness of the furnace eliminates the possibility of corrosion of the outer casings by corrosive gases (see figure below).

 

NDT and inspection services

 

Our level II and/or level III QA Inspectors will provide a comprehensive report for existing overlay to establish scope requirements or on the completion of a weld overlay project.

 

Product

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement