Payment Terms | Western Union, L/C, T/T |
Supply Ability | 500Sets / Month |
Delivery Time | 50 Days |
Packaging Details | Iron Frame Package |
Function | Steam Boiler |
Structure | Tube Heat Exchanger |
Fin material | Stainless steel,aluminum |
Connector | Flange or thread or others |
Pressure | Low Pressure |
Port | Shanghai |
Brand Name | HD BOILER |
Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | ZHANGJIAGANG,CHINA |
View Detail Information
Explore similar products
Waste Heat Recovery Into Energy Module System For Industrial , HDB boiler
ASME Boiler Gas Cooler Heat Exchanger For Power Plant Carbon / Stainless Steel
High Efficiency Flue Gas Cooler Heat Recovery Desulfuration Cleaning System
Air Cooled Steel Finned Tube Bundle Heat Exchanger For Boilers , Flue Gas Heat
Product Specification
Payment Terms | Western Union, L/C, T/T | Supply Ability | 500Sets / Month |
Delivery Time | 50 Days | Packaging Details | Iron Frame Package |
Function | Steam Boiler | Structure | Tube Heat Exchanger |
Fin material | Stainless steel,aluminum | Connector | Flange or thread or others |
Pressure | Low Pressure | Port | Shanghai |
Brand Name | HD BOILER | Model Number | Furnace wall |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | ZHANGJIAGANG,CHINA |
High Light | flue gas heat exchanger , waste heat recovery |
Air cooled Fin tube heat exchanger flue gas cooler for condensing boiler
Air heat exchangeris a kind of heat exchanger that is used to cool or heat forcibly flowing air with water, glycol solution, steam or heat conduction oil as the medium.Different models of heat exchanger should be selected according to the actual working conditions.
Details
1,Before designing this kind of equipment, it is necessary to know the nature of the gases to be cooled and their dust content.
2,The purpose of all that is to design an equipment free of important fouling which would force to make cleaning works more frequently than wanted.
3,We must have in mind as well the availability to detach the dust from the gaseous stream containing it in all those areas where there is a bend or some enlarging in the pass section, which forces to include in the design some systems for dust collection and removal, to allow the correct heat exchange.
Conclusion
1,Kind of fluid.
2,Dust content.
3,Maintenance and cleaning works.
4,Connection of the equipment with the rest of the plant.
5,Depending on the above mentioned factors, different technical solutions may be applied which will go
through the adoption of an arrangement:
6,Vertical/Horizontal.
7,Modular (with only one or many fans).
One or more steps.
Design principle
When the designer's choice is the multi-cyclone collector,or the electrostatic precipitator,or a different type constructed of metals or ther low temperature materials,it becomes necessary to add a gas-cooling device.This is done to assure that he entering flue gases are with in the temperature range of 600 to 700F,with no possibility of even flashes of higher temperatures.
The exit temperature depends upon the materials used downstream from the cooling chamber.Since , however , experience and economical evaluations justifying the use of the high temperature alloys are not generally available this paper is based upon the exit temperatures stated above.
The two agents commonly used as cooling materials are air and water.Both have advantages and disadvantages.Generally,a combination of the two is found most acceptable.However,they must first be considered separately,so that the characteristics of each may be properly evaluated.
Product picture
Company Information
HD Boiler offers a best in class facility,including:
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!