China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired
China Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired

  1. China Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired
  2. China Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired
  3. China Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired

Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 Tons / Month
Delivery Time 50 Days
Packaging Details Iron Frame Package
Material Carbon steel / Stainless steel
Structure Fire / Water Tube
Surface Treatment Painted
Range of Applications Industrial / Power Station
Specification Customized
Port Shanghai
Brand Name HD BOILER
Model Number Furnace wall
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 Tons / Month
Delivery Time 50 Days Packaging Details Iron Frame Package
Material Carbon steel / Stainless steel Structure Fire / Water Tube
Surface Treatment Painted Range of Applications Industrial / Power Station
Specification Customized Port Shanghai
Brand Name HD BOILER Model Number Furnace wall
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin Zhangjiagang,China
High Light flue gas heat exchanger waste heat recovery

Boiler Parts Carbon Steel Boiler Economizer for Thermal Power Plant Coal-fired Boilers

 

Product Description

 

1 Working principle of a flue-gases cooler is the same as in the above-described equipment, but the aim in this case is to cool a primary fluid, not to get a thermal profit by heating a secondary fluid.
2 These equipment are usually installed as the previous step to a flue-gases cleaning, to avoid the gases from reaching the cleaning systems at too high temperatures. This means an alternative to the dilution with air, which would imply an over-sizing of the mentioned systems.

 

Details

 

1 Before designing this kind of equipment, it is necessary to know the nature of the gases to be cooled and their dust content.
2 The purpose of all that is to design an equipment free of important fouling which would force to make cleaning works more frequently than wanted.
3 We must have in mind as well the availability to detach the dust from the gaseous stream containing it in all those areas where there is a bend or some enlarging in the pass section, which forces to include in the design some systems for dust collection and removal, to allow the correct heat exchange.

 

Conclusion

 

To sum up, the following items have to be taken into account when designing a flue-gases cooler:

1 Kind of fluid.
2 Dust content.
3 Maintenance and cleaning works.
4 Connection of the equipment with the rest of the plant.
5 Depending on the above mentioned factors, different technical solutions may be applied which will go through the adoption of an arrangement:
6 Vertical/Horizontal.
7 Modular (with only one or many fans).
One or more steps.

 

Efficiency

 

1 Flue gas condensation may cause the heat recovered to exceed the Lower Heating Value of the input fuel, and thus an efficiency greater than 100%.
2 Since historically most combustion processes have not condensed the fuel, usual efficiency calculations assume the combustion products are not condensed.
3 This assumption is implicit when basing calculations on the Lower Heating Value.
4 A more rigorous approach would be to base efficiency calculations on the Higher Heating Value, which typically results in efficiencies less than 100%.
5 Should the flue gases be cooled below 25 °C (77 °F), even efficiencies based on the Higher Heating Value may exceed 100%, since typical heating value definitions assume that all heat is released when combustion products are cooled to somewhere between 15.56 °C (60.01 °F) and 25 °C (77 °F).

 

Design principle

 

When the designer's choice is the multi-cyclone collector,or the electrostatic precipitator,or a different type constructed of metals or ther low temperature materials,it becomes necessary to add a gas-cooling device.This is done to assure that he entering flue gases are with in the temperature range of 600 to 700F,with no possibility of even flashes of higher temperatures.

 

The exit temperature depends upon the materials used downstream from the cooling chamber.Since , however , experience and economical evaluations justifying the use of the high temperature alloys are not generally available this paper is based upon the exit temperatures stated above.

 

The two agents commonly used as cooling materials are air and water.Both have advantages and disadvantages.Generally,a combination of the two is found most acceptable.However,they must first be considered separately,so that the characteristics of each may be properly evaluated.

 

Whole set product picture

 

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement