China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction
China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction

  1. China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction
  2. China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction
  3. China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction
  4. China Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction

Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction

  1. MOQ: 1 Set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union
Supply Ability 500 Tons / Month
Delivery Time 50 Days
Packaging Details Iron Frame Package
Material Cabon Steel/Stainless Steel/Alloy Steel
Structure Fire / Water Tube
Surface Treatment Painted
Range of Applications Industrial / Power Station
Specification Customized
Port Shanghai
Condition New
Packing Iron Frame Package
Brand Name HD BOILER
Model Number Boiler Membrane Wall
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Zhangjiagang,China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union Supply Ability 500 Tons / Month
Delivery Time 50 Days Packaging Details Iron Frame Package
Material Cabon Steel/Stainless Steel/Alloy Steel Structure Fire / Water Tube
Surface Treatment Painted Range of Applications Industrial / Power Station
Specification Customized Port Shanghai
Condition New Packing Iron Frame Package
Brand Name HD BOILER Model Number Boiler Membrane Wall
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin Zhangjiagang,China
High Light boiler water wall panelsboiler water wall tubes

 

 

Heat Recover Boiler Membrane Wall Tube , Painted Water Wall Construction

 

Boiler Membrane Wall Introduce


1.Membrane walls are widely used in boilers for utility/power stations as a heat exchange part.

 

2.Membane water wall panels were combined with steel tubes and flats to ensure a good sealing and significant reduce the air leakage factor of negative preasure boiler,improve combustion condition in furnace.

 

3.Membrane water wall panels increase radiation heat surface and save steel consumption.

 

 

 

Manufacture


HD Boiler use submerged-arc welding technology to produce water walls as Eco-friendly requirement.

It also can guarantee a good sturdy construction and sealing.

 

 

Constructure Features


1. Check and adjust the width, length, flatness and diagonal of the pipe row when the segmented pipe row is hoisted onto the combination frame.If the width of the tube row is greater than or less than the specified size, the fin can be cut to an appropriate length, adjusted to the specified size and then re-welded.When the diagonal difference of pipe row exceeds lOmm, fins between some pipes with larger size can be cut to reduce the distance between pipes to eliminate the diagonal difference, and then the fins can be welded.When the unevenness of the pipe row exceeds the allowable range, gantry frame can be used to correct the top pressure of the jack.

2. The butt joint of pipe row is different from that of a single pipe.The welding joint of a single pipe shrinks by about 1-2mm after welding, which has no effect on other pipes.But the pipe row is not the same, two sections of pipe row butt welding, if from one side to the other side of the sequence of welding, welding to the end of the pipe caused by the deformation is very large.Therefore, before the butt welding, the butt clearance of this welding joint should be comprehensively measured, and according to the butt clearance is too small, moderate, too large classification, if the butt clearance is too large or too small, must take the method of cutting the pipe, replaced with a moderate short pipe.At this time, due to the shrinkage of welding, the pipe with a larger gap will become solderable. In order to reduce the shrinkage deformation of pipe welding, the method of symmetry and cross welding should be adopted.

3. The lower part of the front and rear water cooling wall has furnace bottom (cold ash bucket), and the upper part of the rear water cooling wall has flame Angle, so the size of the component is larger and the shape is more special, so it is difficult to combine.

4. The single pass ball of the rear water wall pipe is different from other heating surface pipes.Because the rear water wall in the upper header box has a flameproof Angle, the number of flameproof Angle bending pipe is the same as that of the rear water wall, in order to increase the rigidity of the flameproof Angle, there is also a considerable number of spacing straight pipe (most furnace type).At the intersection of flame Angle and straight pipe, equidiameter special-shaped cast steel tee (three-branch pipe) is installed.In the straight tube and the junction between the top allied tank is equipped with orifice Φ 5 mm or Φ restrictor of 10 mm.In this way, most of the working medium bent pipe is conducive to the cooling of the flame Angle, and a small part of the working medium bent pipe ensures that the straight pipe and the curved pipe have the corresponding amount of expansion, so as to reduce the internal stress, so the difficulty of passing through the ball increases.

 

 

Features


1. Sturdy construction
2. High strength
3. Accurate dimensions
4. Corrosion resistant finish

 

 

Advantages


 

1 To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2 To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3 The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4 It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5 Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6 The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 

 

Workshop


Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement