Payment Terms | L/C, T/T, Western Union |
Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days |
Packaging Details | Seaworthy packing |
Material | Carbon Steel,Alloy,Stainless steel |
Surface treatment | Painted |
HS Code | 3215960855 |
Packaging | Iron Frame Packing |
Available | Energy Saving |
Fuel | Coal / Gas / Coal-fired / Water heat |
Brand Name | HD BOILER |
Model Number | Water wall panel |
Certification | ISO9001 , SGS , TUV , ASME , EN |
Place of Origin | China |
View Detail Information
Explore similar products
Environmental Friendly Boiler Water Wall Panels Alloy Seamless ASTM Certificatio
Heat Exchanger Painted Water Wall Panels Boiler Parts For Porwer Station
ASME Standard Bare Water Wall Tubes In Boiler Front And Rear Side Loose Panels
Power Station Coal Combustion Evaporation Section Boiler Water Wall
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 500 Tons / Month |
Delivery Time | 50 Days | Packaging Details | Seaworthy packing |
Material | Carbon Steel,Alloy,Stainless steel | Surface treatment | Painted |
HS Code | 3215960855 | Packaging | Iron Frame Packing |
Available | Energy Saving | Fuel | Coal / Gas / Coal-fired / Water heat |
Brand Name | HD BOILER | Model Number | Water wall panel |
Certification | ISO9001 , SGS , TUV , ASME , EN | Place of Origin | China |
High Light | boiler water wall panels ,boiler water wall tubes |
Super Power Station Boiler Water Wall Panels , Water Wall Tubes In Boiler Iron Frame Packing
Product Description
Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Our membrane water wall are manufactured using high grade raw material and contemporary production equipment at our advanced manufacturing unit. The offered range is available in various sizes, shapes and specifications, as per the requirements of our esteemed clients. Further, these are delivered to the clients within promised time frame.
Manufacturing process:
Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Quality Control
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2015 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company Indroduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!