China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat

  1. China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
  2. China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
  3. China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat
  4. China Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat

Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat

  1. MOQ: 1 Set / Sets 10tons
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms Western Union, L/C, T/T
Supply Ability 500 Tons per month
Delivery Time 30 days
Packaging Details Seaworthy Packing
Name Economizer For Boiler
Usage Power Plant/CFB Boiler
Material Carbon steel
Type Natural Circulation
Structure Hot / Water Tube
Output Hot Water/Steam
Fuel Coal/Gas
Brand Name HD BOILER
Model Number Economizer For Boiler
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, L/C, T/T Supply Ability 500 Tons per month
Delivery Time 30 days Packaging Details Seaworthy Packing
Name Economizer For Boiler Usage Power Plant/CFB Boiler
Material Carbon steel Type Natural Circulation
Structure Hot / Water Tube Output Hot Water/Steam
Fuel Coal/Gas Brand Name HD BOILER
Model Number Economizer For Boiler Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin China
High Light carbon steel steam economiserseamless tube steam economiserwaste heat energy boiler economizer

Carbon Steel Seamless Tube Economizer For Boiler Heat Exchanger ASME Waste Heat Energy

 

 

Quick Details Specifications

 

Specification of Economizer for Boiler Exhaust heat loss is the largest of the heat loss of the power plant boiler, usually 5% to 8%, accounting for 80% of the total heat loss of the boiler or higher.
The main factors that affect the heat loss of the exhaust gas are the boiler exhaust temperature. Under normal circumstances, the exhaust heat temperature increases by 10 ℃ and the exhaust heat loss increases by 0.6% ~ 1.0%.
China's current thermal power units in the boiler exhaust gas temperature is generally around 125 ~ 150 ℃, the actual smoke temperature is higher than the design value is ubiquitous phenomenon.
 

 

 

(1) The economizer is a steam generation system as like a boiler. when the exhaust gas discharge from the engine cylinder through the exhaust valve it goes to the boiler for generate steam by heating of water.

 

(2) After those gas it goes through the economizer the remaining exhaust gas temperature is heated the water in economiser. it help to generate steam, and it is improving the efficiency and save the fuel consumption

 

(3) An economizer uses the waste heat from the boiler exhaust, that would otherwise be lost to atmosphere to (in most cases) preheat the feed water into the boiler.This improves the boiler efficiency and reduces fuel costs.

 

Competitive Advantage

 

1.Fuel saving: After the high temperature fuel gas released by fuel combustion transfers to the boiler water wall tubing, superheater, and reheater, the temperature is extremely high, the economizer makes it ideal for preventing heat loss. The economizer located at the flue of the boiler reduces the flue gas temperature, and maximizes the heat recovery to lower customer fuel costs.

 

2.Improvement of boiler steam drum working conditions: When entering the steam drum, the temperature of the feed water is increased after it has been heated using the economizer. The thermal stress caused by the temperature difference between the steam drum wall and the feed water is reduced, thus reducing the shrink and swell of the steam drum, and extends the service life.

 

3.Cost reduction of coal fired boilers: Water is being heated in the boiler economizer made using low temperature material. This makes the economizer a less costly replacement for high temperature boiler water wall tubing, and reduces overall boiler manufacturing costs.

 

 

 

Parameters

Name Economizer
specifications of finned tube unit(mm)
Bare pipe(od) 25-165
bare pipe(thick) 2-8
finned thicks 0.6-3.0
finned height 5-30
finned tube thread pitch 5-30
finned tube length ≤12000

*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.

 

Internal heat exchangers

 

1.Subcooling may also be produced by superheating the gas leaving the evaporator and heading to the gas compressor.

2.These systems withdraw heat from the liquid line but heat up the gas compressors suction.

3.This is a very common solution to insure that gas reaches the compressor and liquid reaches the valve.

4.It also allows maximum heat exchanger use as minimizes the portion of the heat exchangers used to change the temperature of the fluid,and maximizeds the volume in which the refrigerant changes its phase.

 


 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement