Payment Terms | L/C, T/T, Western Union |
Supply Ability | 1500 Tons / Month |
Delivery Time | 35 Days |
Packaging Details | Seaworthy Packing |
Fuel | Coal |
Type | Boiler Part |
Range of Applications | Power Plant |
Specification | Customized |
Surface Treatment | Anti Corrosion |
Brand Name | HDB |
Model Number | Evaporator Pane With Coils |
Certification | ISO, ASME |
Place of Origin | China |
View Detail Information
Explore similar products
High Temperature Superheater Boiler Spare Parts For Pulverized Coal Boilers
Carbon/Stainless Steel Superheater In Boiler For Natural Circulation Coal -
Alloy Steel Superheater And Reheater For Pulverized Coal Boilers With Natural
Stainless Steel Superheater And Reheater For Utility / Power Station , High
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 1500 Tons / Month |
Delivery Time | 35 Days | Packaging Details | Seaworthy Packing |
Fuel | Coal | Type | Boiler Part |
Range of Applications | Power Plant | Specification | Customized |
Surface Treatment | Anti Corrosion | Brand Name | HDB |
Model Number | Evaporator Pane With Coils | Certification | ISO, ASME |
Place of Origin | China | ||
High Light | superheater in boiler , reheater in power plant |
Evaporator Panel Assembly Coils With ASME Standard Boiler Pressure Parts
GENERAL DESCRIPTION
Water wall panels are the main heating surface of boilers, composed of numbers of rows of steel tubes, arranged around the boiler corner. Inside is the flowing water or steam, and the outside accepts the heat of the flame in the furnace of the boiler, mainly absorbing the radiation heat of the high temperature combustion products in the furnace. The working fluid rises in it and evaporates by heat.
Advantages of Membrane Water Wall
(1) Ensure the sealing of furnace wall and reduce air leakage in combustion chamber.
(2)The realization of full water cooling in combustion chamber is beneficial to prevent coking under the condition of intensified combustion.
(3)The cooling time of start-up and shutdown of boilers can be shortened because of its small heat storage capacity, fast temperature rise and fast cooling in combustion chamber.
(4)Pipe-laying furnace wall is suitable, which greatly reduces the load of boiler frame and it is convenient for suspension and lifting.
(5)Compared with the bare tube type, the heat absorption capacity of the tube is improved.
(6)It improves the per-assembly degree of boiler components, facilitates and reduces the installation workload.
Details
1 | Material composition | Carbon steel, alloy steel or heat-resistant steel, collection boxes and other supporting material. Tubes are customized types of specifications. |
2 | Design pattern | Vertical or horizontal layout. |
3 | Advantages | Beautiful appearance, size, accuracy, first-class bending and welding technology, first-class detection equipment. |
Design structure
1. heating saturated steam, temperature up to 900 degree C.
2. high efficiency, >90%.
3. high speed heating.
4. design with stainless steel.
5. long design service life, 15 years.
Send us required technical data, such as steam capacity, presure, required temperature etc. We will design accordingly.
HD Boiler offers a best in class facility
For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!