China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL
China Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL

  1. China Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL
  2. China Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL
  3. China Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL

Pro - Environment Customized Flue Gas Cooler CE ROHS CCC ISO9001 UL

  1. MOQ:
  2. Price:
  3. Get Latest Price
Structure Tube Heat Exchanger,Plate Heat Exchanger
Application Drying or cooling usage for various equipments,Heater Parts
Liquid flow rate Customized
Product name Hydraulic oil cooler,flue gas cooler
Color Silver or natural color
Tube type Smooth tube,heat pipe
Brand Name HD Boiler
Model Number LSS
Certification CE,ROHS,CCC,ISO9001,UL
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Structure Tube Heat Exchanger,Plate Heat Exchanger Application Drying or cooling usage for various equipments,Heater Parts
Liquid flow rate Customized Product name Hydraulic oil cooler,flue gas cooler
Color Silver or natural color Tube type Smooth tube,heat pipe
Brand Name HD Boiler Model Number LSS
Certification CE,ROHS,CCC,ISO9001,UL Place of Origin China
High Light waste heat recovery flue gas heat recovery

Pro-environment Long Lifetime Flue Gas Cooler for Drying or Cooling usage for Various Equipments

 

 

General Introduction of Product

  • Flue gas coolers are special heat recovery units where sensible heat contained in usually dirty flue gases is used to produce and superheat steam or to preheat process oil streams for energy conservation purposes. The heat recovery section is composed either of horizontal or vertical bare tubes for forced or natural circulation of the steam, respectively.
  •  Working principle of a flue-gases cooler is the same as in the above-described equipment, but the aim in this case is to cool a primary fluid, not to get a thermal profit by heating a secondary fluid.
  • These equipment are usually installed as the previous step to a flue-gases cleaning, to avoid the gases from reaching the cleaning systems at too high temperatures. This means an alternative to the dilution with air, which would imply an over-sizing of the mentioned systems.

Detailed Information

 

 

1
Before designing this kind of equipment, it is necessary to know the nature of the gases to be cooled and their dust content.
2
The purpose of all that is to design an equipment free of important fouling which would force to make cleaning works more frequently than wanted.
3
We must have in mind as well the availability to detach the dust from the gaseous stream containing it in all those areas where there is a bend or some enlarging in the pass section, which forces to include in the design some systems for dust collection and removal, to allow the correct heat exchange.

 

Efficiency

 

(a)Flue gas condensation may cause the heat recovered to exceed the Lower Heating Value of the input fuel, and thus an efficiency greater than 100%.
(b)Since historically most combustion processes have not condensed the fuel, usual efficiency calculations assume the combustion products are not condensed.
(c)This assumption is implicit when basing calculations on the Lower Heating Value. 

(d)A more rigorous approach would be to base efficiency calculations on the Higher Heating Value, which typically results in efficiencies less than 100%.
(e)Should the flue gases be cooled below 25 °C (77 °F), even efficiencies based on the Higher Heating Value may exceed 100%, since typical heating value definitions assume that all heat is released when combustion products are cooled to somewhere between 15.56 °C (60.01 °F) and 25 °C (77 °F).

 

Conclusion

 

To sum up, the following items have to be taken into account when designing a flue-gases cooler:

1 Kind of fluid.
2 Dust content.
3 Maintenance and cleaning works.
4 Connection of the equipment with the rest of the plant.
5 Depending on the above mentioned factors, different technical solutions may be applied which will go through the adoption of an arrangement
6 Vertical/Horizontal.
7 Modular (with only one or many fans).
 

Manufacturing

Flue Gas Heat Recovery Module With Sonic Or Steam Blower Required Standard Of Exhaust Air Emission

 

Company Profile

  • Locates in Dong Lai Industrial Park
  • 150km expressway to Shanghai
  • 60km state road to Suzhou or Wuxi
  • Area 65000m2 (building area 55000m2)
  • Over 700 staff
  • Production of 33,000 tons in 2009
  • Complete 15 export projects (to US, India, Turkey, etc.) in 2009
  • Top 100 Enterprises of Zhangjiagang City
 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement