China factories

China factory - Zhangjiagang HuaDong Boiler Co., Ltd.

Zhangjiagang HuaDong Boiler Co., Ltd.

  • China ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea
China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea

  1. China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea
  2. China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea
  3. China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea
  4. China 88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea

88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea

  1. MOQ: 1 set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T, , Western Union
Supply Ability 500ton/month
Delivery Time 30 working days
Packaging Details Wooden Case
Condition New
Dimension Depends
Type Ultra Super Critical
OEM Yes
Color Red / Blue / White
Usage catalytic Liquid ammonia to urea
Brand Name HDB
Model Number Heat Exchanger Module
Certification ISO9001 , SGS , TUV , ASME , EN
Place of Origin Jiangsu , China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, , Western Union Supply Ability 500ton/month
Delivery Time 30 working days Packaging Details Wooden Case
Condition New Dimension Depends
Type Ultra Super Critical OEM Yes
Color Red / Blue / White Usage catalytic Liquid ammonia to urea
Brand Name HDB Model Number Heat Exchanger Module
Certification ISO9001 , SGS , TUV , ASME , EN Place of Origin Jiangsu , China
High Light Heat Exchanger Module Boiler HeaderOEM Boiler Header88.9mm Boiler Header

88.9mm Heat Exchanger Module Boiler Header For Liquid Ammonia To Urea

 

Details
 
The header is a pipe fitting for mixing boiler working medium and ensuring uniform heating of working medium.Industrial boiler furnace wall is usually composed of rows and rows of tubes (water wall) together, but boiler huge volume, complicated structure, cannot guarantee that all the working medium in the pipe of heat absorption capacity is the same, different parts of heat absorption differs a lot, install header can let each pipe working medium inside converge here, the redistribution to the next level in the tube, so that we can reduce the thermal deviation, make the working medium heat, cooling flow, boiler, the boiler thermal efficiency are optimized to improve;In addition, the size, number and arrangement of the tubes in the upper, middle and lower parts of the boiler are different, and the header is responsible for connecting the sections to ensure the smooth circulation of the working medium.

 

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.
 
Features
 
The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
 
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.
 

 

Product Description
 

Headers collect and distribute steam or water from or to a series of smaller pipes or conduits. They are made of carbon or ferritic steel, generally of the same grade as the piping systems. Unlike piping systems which are usually butt welded and bent, headers are straight.
 
The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.

Application

The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.
Technical parameters of customer design boiler pressure parts header for CFB boiler

The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
 
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

 
Classification

Enamelled Corrugated Sheet Baskets are a compact arrangement of profiled metal sheets placed in the Air Preheater rotor in two or more layers and plays the most important role in the process of heat recovery.
 
The bottom layer, or the cold end layer, is where the air enters and the flue gases are discharged, and is therefore, subjected to severe corrosion due to acid dew point. The Material of Construction and the Profile design of the Heating Elements depends on the operating conditions, quality and type of fuel, etc.
 
Parameters

Diameter(OD)

¢76mm~¢914mm

Diameter(OD)

23000mm

Temperature(℃)

300~1500

 

Application

Steam distribution headers are fabricated out of carbon steel or alloy steel seamless tubes. Customized or tailor made items are offered. Headers, after fabrication, are stress relieved to make the Steam distribution headers free from stresses. They are big pipe headers that transfer water from the downcomers to the risers through a combustion zone where the water gets partially heated to steam from the heat of fuel combustion.
 
Factory Workshop

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    1985

  • Total Annual:

    100,000,000-120,000,000

  • Employee Number:

    1000~1100

  • Ecer Certification:

    Verified Supplier

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...

+ Read More

Get in touch with us

  • Reach Us
  • Zhangjiagang HuaDong Boiler Co., Ltd.
  • Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
  • https://www.boilerfabrication.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement