Payment Terms | L/C, T/T |
Supply Ability | 4800 tons/year |
Delivery Time | 30 days |
Packaging Details | Iron Frame Packing |
Material | Carbon Steel or Alloy Steel |
Application | Power Station and Industrial |
Color | Customized |
Product Name | Water Walls |
Brand Name | HD Boiler |
Model Number | Boiler Water Wall Panel |
Certification | ASME, ISO9001,ISO3834-2 |
Place of Origin | China |
View Detail Information
Explore similar products
Environmental Friendly Boiler Water Wall Panels Alloy Seamless ASTM Certificatio
Heat Exchanger Painted Water Wall Panels Boiler Parts For Porwer Station
ASME Standard Bare Water Wall Tubes In Boiler Front And Rear Side Loose Panels
Power Station Coal Combustion Evaporation Section Boiler Water Wall
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 4800 tons/year |
Delivery Time | 30 days | Packaging Details | Iron Frame Packing |
Material | Carbon Steel or Alloy Steel | Application | Power Station and Industrial |
Color | Customized | Product Name | Water Walls |
Brand Name | HD Boiler | Model Number | Boiler Water Wall Panel |
Certification | ASME, ISO9001,ISO3834-2 | Place of Origin | China |
High Light | ASME Membrane Water Wall Panels ,Power Boilers Water Wall Panels |
ASME Standard Carbon Steel or Alloy Steel Membrane Water Wall Panels for Power Boilers
Boiler water walls are membrane walls that are made of tubes welded together with or without a strip of metal in between. These walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Our membrane water wall are manufactured using high grade raw material and contemporary production equipment at our advanced manufacturing unit. The offered range is available in various sizes, shapes and specifications, as per the requirements of our esteemed clients. Further, these are delivered to the clients within promised time frame.
Strong points of membrane water wall
(1) Ensure the sealing of furnace wall and reduce air leakage in combustion chamber.
(2)The realization of full water cooling in combustion chamber is beneficial to prevent coking under the condition of intensified combustion.
(3)The cooling time of start-up and shutdown of boilers can be shortened because of its small heat storage capacity, fast temperature rise and fast cooling in combustion chamber.
(4)Pipe-laying furnace wall is suitable, which greatly reduces the load of boiler frame and it is convenient for suspension and lifting.
(5)Compared with the bare tube type, the heat absorption capacity of the tube is improved.
(6)It improves the per-assembly degree of boiler components, facilitates and reduces the installation workload.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
1985
Total Annual:
100,000,000-120,000,000
Employee Number:
1000~1100
Ecer Certification:
Verified Supplier
Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ... Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. ...
Get in touch with us
Leave a Message, we will call you back quickly!